Toronto address · Ward 25, Scarborough-Rouge Park
117 Grand River Blvd
The City of Toronto has 1 building permit since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Drains and site services · Back water valve (Sewer only)
back water valve
Applied Jun 11, 2018 · issued Jun 11, 2018 · completed Jun 13, 2018 · Permit 18 175777 DRN
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
10167 Sheppard Ave E · Minor variance
To construct a new two-storey detached dwelling with a three-car integral garage, front porch, side (west)/rear basement walkout and rear deck. Also, to construct a new driveway with two points of vehicular access from Sheppard Avenue East on the lot. The existing one-storey detached dwelling will be demolished.
220 m away · filed Jul 4, 2025 · Deferred
196 Generation Blvd · Minor variance
To construct a single-storey addition in the rear yard to the exisitng two-storey detached dwelling. This application was previously deferred at the July 24, 2024 hearing.
200 m away · filed May 29, 2024 · Approved
10177 Sheppard Ave E · Minor variance
To construct a rear canopy to the existing dwelling and a one-storey cabana in the rear of the property.
220 m away · filed Apr 6, 2017 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.