Toronto address · Ward 12, Toronto-St. Paul's
118 Balmoral Ave
The City of Toronto has 1 building permit since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Drains and site services · Back water valve (Sewer only)
bwv installation
Applied Sep 30, 2022 · issued Oct 3, 2022 · completed Oct 24, 2022 · Permit 22 211573 DRN
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
169-171 Balmoral Avenue and 438-440 Avenue Road
24 storeys · 223 homes · Residential
250 m away · Site plan · Under review · filed Aug 10, 2022
- Under review
49 storeys · Mixed use
250 m away · Site plan · Under review · filed Dec 24, 2025
- Under review
51 storeys · 461 homes · Mixed use
350 m away · Site plan · Under review · filed Sep 7, 2022
- Under review
175-195 St Clair Avenue West and 273 Poplar Plains Road
13 storeys · 164 homes · Residential
390 m away · Site plan · Under review · filed Sep 29, 2021
- Under review
41 storeys · 489 homes · Mixed use
390 m away · Site plan · Under review · filed Sep 2, 2022
- Under review
50 storeys · 534 homes · Mixed use
410 m away · Condominium · Under review · filed Sep 24, 2021
Neighbours’ Committee of Adjustment files within 250 m
64 Balmoral Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear second storey addition. Also, to reconstruct a portion of the front lower level for the use of an integral one-car garage.
170 m away · filed Dec 9, 2025 · Approved
18 Foxbar Rd · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a partially enclosed front porch with a canopy and stairs, and a rear covered (trellis) deck with stairs. Also, to reconstruct the rear third storey dormer.
120 m away · filed May 12, 2025 · Approved
147 Farnham Ave · Minor variance
To construct a new three-storey detached dwelling with a front integral garage, a front covered porch, a rear first floor upper deck with lower terrace, rear basement walkout stairs and entry, and a rear third floor roof deck. The existing two-storey detached dwelling will be demolished.
190 m away · filed Apr 19, 2024 · Approved
147 Farnham Ave · Consent
To obtain consent to sever the property into two residential lots.
190 m away · filed Apr 19, 2024 · Approved
147 Farnham Ave · Minor variance
To construct a new three-storey detached dwelling with a front integral garage, a front covered porch, a rear first floor upper deck with lower terrace, rear basement walkout stairs and entry, and a rear third floor roof deck. The existing two-storey detached dwelling will be demolished.
190 m away · filed Apr 19, 2024 · Approved
32 Foxbar Rd · Minor variance
To construct a new three-storey detached dwelling with a front covered porch, a front integral garage, and a rear patio.
90 m away · filed Mar 12, 2024 · Deferred
72 Balmoral Ave · Minor variance
To convert the existing two-storey semi-detached dwelling from one-unit into two-units (including one primary unit and one secondary suite (to be located within the basement)), by constructing a front basement walkout, a side exterior staircase, and a front ground floor balcony.
140 m away · filed Jan 26, 2023 · Approved
86 Woodlawn Ave W · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing an attached garage and covered porch at the rear of the dwelling, abutting the east lot line. The existing ancillary building (detached garage) will be demolished.
250 m away · filed Oct 20, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.