Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 13, Toronto Centre

118 Spruce St

The City of Toronto has 4 building permits since 2017 (4 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Interior alterations

    Make interior alterations to portion of the first floor living room..

    Applied Apr 15, 2003 · issued Apr 15, 2003 · Permit 03 124051 BLD

    Inspections under way
  • Plumbing

    Plumbing - Install fixtures as per data sheet.cost included in bp

    Applied Apr 4, 2003 · issued Mar 3, 2004 · Permit 03 121426 PLB

    Inspections under way
  • Small residential project · Multiple projects

    Make interior alterations to the 1st, 2nd and 3rd floor, convert rear window to door on 1st floor, construct new window opening on east elevation 1st floor, convert existing rear window 1st floor to bay window, and add roof deck over existing 2nd floor at rear. Roof with deck to be reconstructed.

    Applied Apr 4, 2003 · issued May 2, 2003 · Permit 03 121426 BLD

    Inspections under way
  • Small residential project · Other

    Install two skylights to third floor roof.

    Applied Oct 8, 2002 · issued Oct 8, 2002 · Permit 02 179536 BLD

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 393 Carlton St · Minor variance

    To alter the existing three-storey rowhouse dwelling by enlarging the existing ground floor covered front porch with new front stairs and a new front basement walkout.

    120 m away · filed Jun 11, 2026 · Approved

  • 407 Carlton St · Minor variance

    To alter the existing two-and-one-half-storey townhouse by converting the attic into habitable space and to construct a rear third storey addition with a balcony.

    110 m away · filed Mar 25, 2026 · Approved

  • 45 Geneva Ave · Minor variance

    To alter the existing two-storey townhouse dwelling by enlarging the rear two-storey addition. Also, to construct a rear ground floor deck with stairs.

    90 m away · filed Mar 10, 2026 · Approved

  • 28 Sword St · Minor variance

    To construct a one-storey detached ancillary building (two-car garage) in the rear yard, abutting the laneway.

    70 m away · filed Feb 18, 2026 · Approved

  • 2 Geneva Ave · Minor variance

    To alter the existing two-storey rowhouse dwelling by constructing a partial rear second storey addition with a rear juliette balcony. The existing rear second storey roof deck will be demolished.

    90 m away · filed Apr 8, 2025 · Approved

  • 147 Spruce St · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear ground floor deck with stairs and a swim spa.

    110 m away · filed Feb 13, 2024 · Postponed

  • 40 Nasmith Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing one and two -storey rear additions (with an unfinished basement), as well as a rear ground floor deck with stairs.

    160 m away · filed Oct 10, 2023 · Refused

  • 126 Spruce St · Minor variance

    To construct a new one-storey ancillary building (detached garage with hobby workshop) in the rear yard, abutting the laneway (Chipping Sparrow Lane).

    20 m away · filed Sep 14, 2023 · Approved

Everything planned in Toronto Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.