Toronto address · Ward 19, Beaches-East York
119 Barker Ave
The City of Toronto has 4 building permits since 2017 (3 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Heating and ventilation
HVAC - Proposal to construct a 2 storey rear and side addition plus basement, new rear deck and interior alterations in the basement of the existing single family dwelling.
Applied Nov 4, 2022 · issued Nov 14, 2022 · Permit 20 222864 HVA
- Inspections under way
Small residential project · Multiple projects
Proposal to construct a 2 storey rear and side addition plus basement, new rear deck and interior alterations in the basement of the existing single family dwelling.
Applied Nov 26, 2020 · issued Sep 23, 2021 · Permit 20 222864 BLD
- Inspections under way
Plumbing
Plumbing - Proposal to construct a 2 storey rear and side addition plus basement, new rear deck and interior alterations in the basement of the existing single family dwelling.
Applied Nov 26, 2020 · issued Sep 23, 2021 · Permit 20 222864 PLB
- Closed
Drains and site services
Drain - Proposal to construct a 2 storey rear and side addition plus basement, new rear deck and interior alterations in the basement of the existing single family dwelling.
Applied Nov 26, 2020 · issued Sep 23, 2021 · completed Jan 13, 2023 · Permit 20 222864 DRN
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To alter the existing two-storey detached dwelling by constructing a rear two storey addition and rear ground floor deck.
Decision: Approved (hearing Jul 22, 2020)
Filed Nov 29, 2019 · File A1221/19TEY
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
705 Mortimer Ave · Minor variance
200 m away · filed Sep 22, 2026 · Accepted
254 Coleridge Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear cantilevered second storey addition. The existing enclosed front porch, and the rear one-storey ancillary building (shed) will be maintained and unaltered.
150 m away · filed Mar 18, 2026 · Approved
122 Holborne Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a new front one-storey addition (enclosing the existing front porch).
200 m away · filed Nov 18, 2025 · Approved
206 Lumsden Ave · Minor variance
To legalize and to maintain the existing enclosed front porch that was constructed without an authorized building permit.
190 m away · filed Oct 24, 2024 · Approved
110 Barker Ave · Minor variance
To legalize and to maintain the conversion of the integral garage into habitable space with a front ground floor basement walkout entrance, that was constructed without an authorized building permit. There will be zero parking spaces on-site.
50 m away · filed Jun 11, 2024 · Deferred
215 Woodmount Ave · Minor variance
To alter the existing one-storey detached dwelling by constructing a new rear ground level addition (with attached rear covered deck), and a new side (south) entrance. Also, to enlarge the covered front porch with stairs.
170 m away · filed May 13, 2024 · Approved
686 Mortimer Ave · Minor variance
To alter the existing one-storey detached dwelling by constructing a rear one-storey addition with a rear covered basement walkout.
160 m away · filed Oct 23, 2023 · Approved
216 Woodmount Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear ground floor deck.
170 m away · filed May 29, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.