Toronto address · Ward 8, Eglinton-Lawrence
119 Glenview Ave
The City of Toronto has 7 building permits since 2017 and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation
Revision - from forced air to boiler
Applied Oct 10, 2019 · issued Oct 22, 2019 · completed May 4, 2021 · Permit 18 272593 HVA (revision 01)
- Closed
Heating and ventilation
HVAC - Proposal for a 1 storey rear addition (30.35m2), front covered porch, rear deck and interior alterations to the main floor (32.27m2)
Applied Jan 2, 2019 · issued May 28, 2019 · completed May 4, 2021 · Permit 18 272593 HVA
- Closed
Small residential project · Multiple projects
Proposal for a 1 storey rear addition (30.35m2), front covered porch, rear deck and interior alterations to the main floor (32.27m2)
Applied Dec 28, 2018 · issued May 9, 2019 · completed May 26, 2021 · Permit 18 272593 BLD
- Closed
Plumbing
Plumbing - Proposal for a 1 storey rear addition (30.35m2), front covered porch, rear deck and interior alterations to the main floor (32.27m2)
Applied Dec 28, 2018 · issued May 9, 2019 · completed May 4, 2021 · Permit 18 272593 PLB
- Closed
Plumbing
Plumbing - PROPOSED UNDERPINNING (106'-2 3/4" = 32.38 M) BASEMENT FINISHES (67.65 SQ.M.) AND INTERIOR ALTERATIONS ON SECOND FLOOR ( 0.57 m2) AND THIRD FLOOR ( 4.52 m2)
Applied Dec 6, 2018 · issued Dec 14, 2018 · completed May 26, 2021 · Permit 18 265498 PLB
- Closed
Small residential project · Multiple projects
Proposed underpinning (106'-2 3/4" = 32.38 m) basement finishes (67.65 sq.m.)
Applied Dec 6, 2018 · issued Dec 14, 2018 · completed May 26, 2021 · Permit 18 265498 BLD
- Closed
Drains and site services
Drain - PROPOSED UNDERPINNING (106'-2 3/4" = 32.38 M) BASEMENT FINISHES (67.65 SQ.M.) AND INTERIOR ALTERATIONS ON SECOND FLOOR ( 0.57 m2) AND THIRD FLOOR ( 4.52 m2)
Applied Dec 6, 2018 · issued Dec 14, 2018 · completed May 4, 2021 · Permit 18 265498 DRN
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To construct a rear one-storey addition, in conjunction with other interior and exterior alterations.
Decision: Approved (hearing Mar 7, 2019)
Filed Jan 14, 2019 · File A0020/19NY
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
81 Glenview Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a two-storey front (north) addition and a vestibule with a new entry platform on the east side.
220 m away · filed Aug 28, 2026 · Hearing scheduled
83 Glengrove Ave W · Minor variance
To construct a covered terrace at the rear of the existing dwelling.
250 m away · filed Oct 17, 2025 · Approved
309 Rosewell Ave · Minor variance
To alter the existing dwelling to construct a new addition, interior alterations on all floors, new front exterior stair, new lower rear patio and rear deck.
230 m away · filed Mar 14, 2025 · Approved
97 Glenview Ave · Minor variance
To construct a 2 storey addition to the north side of the dwelling.
140 m away · filed Mar 10, 2025 · Approved
84 Glengrove Ave W · Minor variance
To construct a new two storey detached dwelling.
120 m away · filed Dec 13, 2024 · Approved
84 Glengrove Ave W · Minor variance
Proposal to construct a new dwelling.
120 m away · filed May 23, 2024 · Refused
41 Heather St · Minor variance
To construct a new dwelling.
150 m away · filed May 13, 2024 · Approved
311 Rosewell Ave · Minor variance
To construct a new 2 storey dwelling with a rear covered deck
230 m away · filed Apr 30, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.