Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 2, Etobicoke Centre

1190 Kipling Ave

The City of Toronto has 5 building permits since 2017 (5 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    Rev01 - Interior alterations on the second floor, new mech room on second floor, new deck at south side of houseHVAC - To construct a second storey front addition, interior alterations, side covered deck

    Applied Jun 29, 2023 · issued Jul 14, 2023 · Permit 22 230299 HVA (revision 01)

    Revision issued
  • Small residential project · Multiple projects

    Rev01 - Interior alterations on the second floor, new mech room on second floor, new deck at south side of houseTo construct a second storey front addition, interior alterations, side covered deck

    Applied May 30, 2023 · issued Jul 26, 2023 · Permit 22 230299 BLD (revision 01)

    Revision issued
  • Small residential project · Multiple projects

    To construct a second storey front addition, interior alterations, side covered deck

    Applied Nov 17, 2022 · issued Dec 1, 2022 · Permit 22 230299 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - To construct a second storey front addition, interior alterations, side covered deck

    Applied Nov 17, 2022 · issued Dec 1, 2022 · Permit 22 230299 HVA

    Inspections under way
  • Plumbing

    Plumbing - To construct a second storey front addition, interior alterations, side covered deck

    Applied Nov 17, 2022 · issued Dec 1, 2022 · Permit 22 230299 PLB

    Inspections under way

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To construct a second storey front addition, a new covered south side deck and second storey front balcony.

    Decision: Approved (hearing May 19, 2022)

    Filed Apr 11, 2022 · File A0231/22EYK

    Closed

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 29 Tasker Rd · Minor variance

    To construct a new detached dwelling with an attached garage.

    220 m away · filed Jul 22, 2025 · Approved

  • 47 Burrows Ave · Minor variance

    To construct a two-storey front addition and a second storey addition above the existing dwelling.

    110 m away · filed Oct 25, 2024 · Approved

  • 76 Hillcroft Dr · Minor variance

    To construct a new detached dwelling with an attached garage.

    210 m away · filed Nov 7, 2023 · Approved

  • 1162 Kipling Ave · Minor variance

    To enclose the existing front porch and to construct a new front porch.

    210 m away · filed Jun 12, 2023 · Approved

  • 78 Hillcroft Dr · Minor variance

    To construct a one-storey rear yard addition.

    220 m away · filed Nov 23, 2022 · Approved

  • 8 Greening Cres · Minor variance

    To construct a second storey addition above the existing dwelling and new rear yard shed.

    130 m away · filed Apr 6, 2022 · Approved

  • 68 Burrows Ave · Minor variance

    To construct a second storey west side platform.

    110 m away · filed Jun 27, 2021 · Approved

  • 24 Hillcroft Dr · Minor variance

    To construct a one storey rear addition, a second storey addition over the existing dwelling and increase the existing attached single car garage to a double car garage.

    170 m away · filed Mar 22, 2021 · Approved

Everything planned in Etobicoke Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.