Toronto address · Ward 14, Toronto-Danforth
11A Bloomfield Ave
The City of Toronto has 10 building permits since 2017 (5 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Issuance pending
Plumbing
Plumbing - Proposal to construct a new two storey Laneway Suite in the rear yard of an existing 2 unit semi.See also 23 229908 ZAP and 24 124549 MV.
Applied Jul 21, 2025 · Permit 25 197427 PLB
- Issuance pending
Drains and site services
Drain - Proposal to construct a new two storey Laneway Suite in the rear yard of an existing 2 unit semi.See also 23 229908 ZAP and 24 124549 MV.
Applied Jul 21, 2025 · Permit 25 197427 DRN
- Pending cancellation
Small residential project · New laneway / rear yard suite
Proposal to construct a new two storey Laneway Suite in the rear yard of an existing 2 unit semi.See also 23 229908 ZAP and 24 124549 MV.
Applied Jul 21, 2025 · 1 home added · Permit 25 197427 BLD
- Examiner's notice sent
Heating and ventilation
HVAC - Proposal to construct a new two storey Laneway Suite in the rear yard of an existing 2 unit semi.See also 23 229908 ZAP and 24 124549 MV.
Applied Jul 21, 2025 · Permit 25 197427 HVA
- Revision issued
Heating and ventilation
Revision #02 - Changes to HVAC.Revision 01 - Changes to interior ductwork layout.HVAC - Existing front porch to be heated, interior alterations throughout the dwelling, new secondary suite in basement, walkout basement and rear deck, rear one storey addition, extension of existing detached garage, addition of skylight, basement underpinning
Applied Aug 13, 2024 · issued Mar 6, 2026 · Permit 23 145897 HVA (revision 02)
- Cancelled
Heating and ventilation
Revision 01 - Changes to interior ductwork layout.HVAC - Existing front porch to be heated, interior alterations throughout the dwelling, new secondary suite in basement, walkout basement and rear deck, rear one storey addition, extension of existing detached garage, addition of skylight, basement underpinning
Applied Apr 17, 2024 · completed Apr 22, 2024 · Permit 23 145897 HVA (revision 01)
- Closed
Drains and site services
Drain - Existing front porch to be heated, interior alterations throughout the dwelling, new secondary suite in basement, walkout basement and rear deck, rear one storey addition, extension of existing detached garage, addition of skylight, basement underpinning
Applied May 15, 2023 · issued Jul 11, 2023 · completed Apr 2, 2024 · Permit 23 145897 DRN
- Inspections under way
Small residential project · Multiple projects
Existing front porch to be heated, interior alterations throughout the dwelling, new secondary suite in basement, walkout basement and rear deck, rear one storey addition, addition of skylight, basement underpinning
Applied May 15, 2023 · issued Jul 11, 2023 · 1 home added · Permit 23 145897 BLD
- Closed
Heating and ventilation
HVAC - Existing front porch to be heated, interior alterations throughout the dwelling, new secondary suite in basement, walkout basement and rear deck, rear one storey addition, extension of existing detached garage, addition of skylight, basement underpinning
Applied May 15, 2023 · issued Aug 2, 2023 · completed Sep 9, 2025 · Permit 23 145897 HVA
- Closed
Plumbing
Plumbing - Existing front porch to be heated, interior alterations throughout the dwelling, new secondary suite in basement, walkout basement and rear deck, rear one storey addition, extension of existing detached garage, addition of skylight, basement underpinning
Applied May 15, 2023 · issued Jul 11, 2023 · completed Sep 9, 2025 · Permit 23 145897 PLB
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
1291-1311 Gerrard Street East and 243-247 Greenwood Avenue
12 storeys · 289 homes · Mixed use
290 m away · Site plan · Under review · filed May 4, 2023
Neighbours’ Committee of Adjustment files within 250 m
1250 Gerrard St E · Minor variance
To alter the existing three-storey mixed-use rowhouse dwelling by constructing a rear three-storey addition with a basement walkout, and an exterior fire escape staircase leading to all the levels. Also, to construct one ground level office space, and four residential dwelling units within this dwelling. There will be a total of five bicycle parking spaces provided in the rear yard. The existing ground level commercial space (coin laundry facility) will be maintained and unaltered.
200 m away · filed Jan 8, 2026 · Approved
44 Sandford Ave · Minor variance
To legalize and to maintain a one-storey detached ancillary building (containing one laneway suite) in the rear yard, abutting the laneway. This ancillary building was constructed without an authorized building permit.
110 m away · filed Nov 12, 2025 · Approved
2 Prust Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey addition, which will be cantilevered at the rear of the building.
140 m away · filed Sep 18, 2025 · Approved
12 Sandford Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a third-storey addition, and a front yard parking pad.
30 m away · filed Jun 18, 2025 · Approved
55 Harriet St · Minor variance
To legalize and to maintain a new three-storey 12-unit apartment building that will span over 3 lots (municipally known as 53, 55, and 57 Harriet Street). This apartment building will contain a total of 4 residential dwellings units on each lot, with front porches, front basement walkouts, front and rear third storey balconies, and rear ground level decks. This building is currently under construction, beyond the limits of the authorized building permit(s). Also, there will be a two-storey ancillary building containing one laneway suite, abutting the laneway at 55 Harriet Street. This will in…
110 m away · filed Jun 13, 2025 · Approved
53 Harriet St · Minor variance
To legalize and to maintain a new three-storey 12-unit apartment building that will span over 3 lots (municipally known as 53, 55, and 57 Harriet Street). This apartment building will contain a total of 4 residential dwellings units on each lot, with front porches, front basement walkouts, front and rear third storey balconies, and rear ground level decks. This building is currently under construction, beyond the limits of the authorized building permit(s). Also, there will be a two-storey ancillary building containing one laneway suite, abutting the laneway at 53 Harriet Street. This will in…
110 m away · filed Jun 13, 2025 · Approved
57 Harriet St · Minor variance
To legalize and to maintain a new three-storey 12-unit apartment building that will span over 3 lots (municipally known as 53, 55, and 57 Harriet Street). This apartment building will contain a total of 4 residential dwellings units on each lot, with front porches, front basement walkouts, front and rear third storey balconies, and rear ground level decks. This building is currently under construction, beyond the limits of the authorized building permit(s). Also, there will be a two-storey ancillary building containing one laneway suite, abutting the laneway at 57 Harriet Street. This will in…
110 m away · filed Jun 13, 2025 · Approved
1152 Gerrard St E · Minor variance
To legalize and maintain the conversion of the existing two-storey detached building into an apartment building with 13 residential dwelling units. There will be a new ground floor steel balcony on the east side, a new ground level balcony on the west side, and a new steel canopy on the south side. The following will be maintained and unaltered: 3 parking spaces (1 of which is for visitor space) fronting Hastings Avenue; 12 long-term bicycle parking spaces along a portion of the north lot line; 2 short-term bicycle parking spaces, the existing decks and patios; and the existing steel trailer.…
220 m away · filed Jan 13, 2025 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.