Toronto address · Ward 4, Parkdale-High Park
12 Fern Ave
The City of Toronto has 4 building permits since 2017 (1 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Small residential project · Interior alterations
Proposed alterations to the dwelling. Scope of work includes enlarging rear yard door/window opening).
Applied Jun 3, 2026 · issued Jun 4, 2026 · Permit 26 177130 BLD
- Cancelled
Small residential project · Multiple projects
Proposal to construct a new garage in the rear yard and exterior alterations to enlarge patio doors.
Applied May 26, 2026 · completed May 29, 2026 · Permit 26 167254 BLD
- Closed
Small residential project · Other
Proposed installation of solar panels on residential rooftop.
Applied Apr 19, 2024 · issued Jun 20, 2024 · completed Feb 14, 2025 · Permit 24 138069 BLD
- Closed
Small residential project · Multiple projects
Basement underpinning, finish basement and fixture replacement on the ground floor (bathroom)
Applied May 8, 2014 · issued May 14, 2014 · completed Feb 6, 2026 · Permit 14 153619 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
223 Sorauren Ave · Consent
180 m away · filed May 13, 2026 · Withdrawn
223 Sorauren Ave · Minor variance
180 m away · filed May 13, 2026 · Withdrawn
223 Sorauren Ave · Minor variance
180 m away · filed May 13, 2026 · Withdrawn
54 Wright Ave · Minor variance
To alter the existing three-storey detached dwelling by constructing a new covered front porch with stairs, a front second storey addition with a third storey balcony above, a rear at-grade patio, a rear second floor deck with stairs, and a rear third storey bay window. Also, to convert the existing front integral garage into habitable space.
150 m away · filed Feb 20, 2026 · Approved
145 Lansdowne Ave · Minor variance
To alter the existing three-storey detached apartment building (containing 5 residential dwelling units) by converting the existing ground floor integral two-car garage into one additional residential dwelling unit. Also, to construct a refuse enclosure along a portion of the rear wall. There will be a total of 6 residential dwelling units within this apartment building and 4 lawful parking spaces on-site.
250 m away · filed Nov 19, 2025 · Approved
19 Galley Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a front covered porch extension, a rear two-storey addition with a partially covered ground floor deck, and a third storey addition. Also, to construct a new one-storey ancillary building (detached garage) in the rear yard, abutting the laneway.
250 m away · filed Nov 10, 2025 · Approved
45 Fern Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear one-storey addition, a rear ground floor deck with stairs, and one residential dwelling unit within the basement. Also, to construct a new one-storey ancillary structure (storage shed) in the rear yard. There will be a total of two residential dwelling units on this lot (one unit within the basement level, and one unit occupying the first, second, and third levels).
90 m away · filed Sep 23, 2025 · Approved
229 Sorauren Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a complete third floor addition, a front porch with stairs, a front basement walkout, and a rear third floor terrace. There will be a secondary suite within the basement.
190 m away · filed Sep 4, 2025 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.