Toronto address · Ward 9, Davenport
12 Marshall St
The City of Toronto has 2 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Cancelled
Drains and site services · Back water valve (Sewer only)
Proposed backwater valve install
Applied Apr 23, 2025 · issued May 14, 2025 · completed Jun 16, 2025 · Permit 25 147884 DRN
- Closed
Small residential project · Party wall admin permits
Admin permit related to work being completed at 14 Marshall
Applied Feb 7, 2019 · issued Feb 15, 2019 · completed Feb 27, 2023 · Permit 19 113057 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
8 storeys · 57 homes · Mixed use
180 m away · Site plan · Under review · filed Feb 15, 2023
- Under review
1-3 Boland Lane and 646-648 Dufferin Street
8 storeys · 135 homes · Residential
200 m away · Condominium · Under review · filed Oct 12, 2021
- Under review
18 storeys · 176 homes · Mixed use
480 m away · Site plan · Under review · filed Jun 30, 2025
Neighbours’ Committee of Adjustment files within 250 m
15 Wyndham St · Minor variance
To construct a one-storey ancillary building (art workshop), including a green roof, in the rear yard (abutting Mechanic Avenue).
190 m away · filed Jul 31, 2026 · Hearing scheduled
1596 Dundas St W · Minor variance
To alter the existing three-storey mixed-use building (containing a ground floor commercial unit and ten residential dwelling units) by converting the existing storage space into three new residential dwelling units (two dwelling units in the basement, and one dwelling unit on the ground level). The existing 12 long-term bicycle parking spaces and 4 short-term bicycle parking spaces will be maintained and unaltered. There will be a total of 13 residential dwelling units on this lot.
180 m away · filed Oct 20, 2025 · Approved
118 Sheridan Ave · Minor variance
To construct a new two-storey detached ancillary building (for the purpose of a lounge and storage area on the ground level, and a loft on the second level), in the rear yard of the existing two-and-one-half-storey townhouse dwelling. This ancillary building will not be used for habitable space. The existing ancillary building in the rear yard will be demolished.
80 m away · filed May 30, 2025 · Approved
1498 Dundas St W · Minor variance
To alter the development standards (as approved under Site Specific Zoning By-law 953-2021), for a new 8-storey mixed-use building, by increasing the gross floor area, and portions of the building heights, and by reducing the number of residential parking spaces. There will be a total of 62 residential dwelling units on this lot.
200 m away · filed Feb 21, 2025 · Approved
11 Bank St · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing one and two-storey rear additions.
240 m away · filed Oct 24, 2024 · Approved
646 Dufferin St · Minor variance
To alter the development standards (as approved by Site Specific Zoning By-law 950-2021), for an eight-storey apartment building, by increasing the permitted height and the gross floor area, and to reduce a portion of the rear building setbacks and the number of parking spaces on-site. There will be a total of 168 residential dwelling units on this lot.
240 m away · filed Oct 23, 2024 · Approved
646 Dufferin St · Minor variance
To alter the development standards of the eight-storey residential building (as approved by Site Specific Zoning By-law 950-2021) by reducing a portion of the building setbacks, the first-floor height, and soft landscaping requirements.
240 m away · filed Dec 6, 2023 · Approved
10 Hickson St · Consent
To obtain consent for a technical severance to re-establish pre-existing lot lines of three residential lots which merged on title.
200 m away · filed Mar 23, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.