Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 17, Don Valley North

1200 Sheppard Ave E

The City of Toronto has 28 building permits since 2017 (18 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Alternative solution

    This proposal addresses the standpipe system to be installed in the new sprinklered, residential Central Park Tower 3a at 1200-1220 Sheppard Avenue East, Toronto. The Tower 3a project is the second phase ('Phase 2A') of construction of a 4-tower building. The Tower 3a project will be 31 storeys in height with four basement levels devoted primarily to vehicle parking.

    Applied Mar 10, 2026 · completed Apr 22, 2026 · Permit 26 127589 ALT

    Approved
  • New building

    Rev 01: revision to layout design. Phase 1 - 31-storey mixed use building containing 322 residential units, retail uses at grade and 4 levels of underground parking.(19 238841 NNY 17 SA). Development is for creation of a mixed use development comprised of an existing office development, and three new mixed use buildings with 5 new residential towers for a total maximum gross floor area of 3.94 times the area of the lot. A maximum of 1,478 dwelling units and a total combined gross floor area of 159,779 square metres is permitted.

    Applied Jan 13, 2026 · issued Feb 11, 2026 · Permit 20 232683 BLD (revision 01)

    Revision issued
  • Plumbing

    Plumbing - Proposed interior alterations to convert newly constructed space to retail store.

    Applied Dec 3, 2025 · issued Feb 25, 2026 · completed May 1, 2026 · Permit 25 262010 PLB

    Closed
  • Heating and ventilation

    HVAC - Proposed interior alterations to convert newly constructed space to retail store.

    Applied Dec 3, 2025 · issued Feb 25, 2026 · completed May 1, 2026 · Permit 25 262010 HVA

    Closed
  • Addition or alteration · Interior alterations

    Proposed interior alterations to convert newly constructed space to take-out Cafe

    Applied Dec 3, 2025 · issued Feb 24, 2026 · completed Apr 29, 2026 · Permit 25 262010 BLD

    Closed
  • Partial permit · Partial permit - structural framing

    Part Permit - Phase 3 - Build 3rd tower (Tower 3B) and part of associated podium and U/G parking garage. Development is for creation of a mixed use development comprised of an existing office development, and three new mixed use buildings with 5 new residential towers for a total maximum gross floor area of 3.94 times the area of the lot. A maximum of 1,478 dwelling units and a total combined gross floor area of 159,779 square metres is permitted.

    Applied Oct 8, 2025 · Permit 24 244183 STR

    Application acceptable
  • Partial permit · Partial permit - foundation

    Part Permit - Phase 3 - Build 3rd tower (Tower 3B) and part of associated podium and U/G parking garage. Development is for creation of a mixed use development comprised of an existing office development, and three new mixed use buildings with 5 new residential towers for a total maximum gross floor area of 3.94 times the area of the lot. A maximum of 1,478 dwelling units and a total combined gross floor area of 159,779 square metres is permitted.

    Applied Oct 8, 2025 · Permit 24 244183 FND

    Application acceptable
  • Alternative solution

    Proposal for an Alternative Solution in regards to eliminating smoke dampers in corridors.

    Applied Sep 18, 2025 · completed Oct 30, 2025 · Permit 25 227502 ALT

    Approved
  • Partial permit · Partial permit - structural framing

    Part Permit - Phase 2 - Build 2nd tower (Tower 3A) and part of associated podium and U/G parking garage with 393 units, 31 storeys plus mechanical penthouse. Development is for creation of a mixed use development comprised of an existing office development, and three new mixed use buildings with 5 new residential towers for a total maximum gross floor area of 3.94 times the area of the lot. A maximum of 1,478 dwelling units and a total combined gross floor area of 159,779 square metres is permitted.

    Applied Mar 24, 2025 · issued Dec 18, 2025 · completed Sep 10, 2026 · Permit 24 131935 STR

    Closed
  • Partial permit · Partial permit - foundation

    Part Permit - Phase 2 - Build 2nd tower (Tower 3A) and part of associated podium and U/G parking garage with 393 units, 31 storeys plus mechanical penthouse. Development is for creation of a mixed use development comprised of an existing office development, and three new mixed use buildings with 5 new residential towers for a total maximum gross floor area of 3.94 times the area of the lot. A maximum of 1,478 dwelling units and a total combined gross floor area of 159,779 square metres is permitted.

    Applied Mar 24, 2025 · completed Nov 6, 2025 · Permit 24 131935 FND

    Superseded
  • Conditional permit · New building

    Conditional Permit - PHASE 1 - BUILD U/G PARKING GARAGE AND ONE CONDO TOWER 31 STOREY HIGH. FIRST (TOWER 2) OUT OF 5 TOTAL TOWERS. (19 238841 NNY 17 SA). Development is for creation of a mixed use development comprised of an existing office development, and three new mixed use buildings with 5 new residential towers for a total maximum gross floor area of 3.94 times the area of the lot. A maximum of 1,478 dwelling units and a total combined gross floor area of 159,779 square metres is permitted.

    Applied Mar 18, 2025 · issued May 22, 2025 · completed Jan 6, 2026 · Permit 20 232683 BLD

    Closed
  • Alternative solution

    This proposal addresses the standpipe system to be installed in a new sprinklered, residential apartment project: Central Park Tower 2 at 1200-1220 Sheppard Avenue East, Toronto. The Tower 2 project is the first phase ('Phase 1A') of construction of a 4-tower building. The Tower 2 project will be 31 storeys in height with four basement levels devoted primarily to vehicle parking.

    Applied Mar 10, 2025 · completed Mar 14, 2025 · Permit 25 126887 ALT

    Approved
Show 16 more permits
  • Heating and ventilation

    HVAC - Phase 3 - Build 3rd tower (Tower 3B) and part of associated podium and U/G parking garage

    Applied Dec 13, 2024 · Permit 24 244183 HVA

    Examiner's notice sent
  • New building

    Phase 3 - Build 3rd tower (Tower 3B) and part of associated podium and U/G parking garage. Development is for creation of a mixed use development comprised of an existing office development, and three new mixed use buildings with 5 new residential towers for a total maximum gross floor area of 3.94 times the area of the lot. A maximum of 1,478 dwelling units and a total combined gross floor area of 159,779 square metres is permitted.

    Applied Nov 27, 2024 · Permit 24 244183 BLD

    Examiner's notice sent
  • Drains and site services

    Drain - Phase 2 - Build 2nd tower (Tower 3A) and part of associated podium and U/G parking garage

    Applied May 17, 2024 · issued May 20, 2026 · Permit 24 131935 DRN

    Permit issued
  • Drains and site services · Site service

    Site Service - Phase 2 - Build 2nd tower (Tower 3A) and part of associated podium and U/G parking garage

    Applied Apr 30, 2024 · issued Sep 10, 2026 · Permit 24 131935 STS

    Permit issued
  • Plumbing

    Plumbing - Phase 2 - Build 2nd tower (Tower 3A) and part of associated podium and U/G parking garage

    Applied Apr 3, 2024 · issued May 20, 2026 · Permit 24 131935 PLB

    Permit issued
  • Heating and ventilation

    HVAC - Phase 2 - Build 2nd tower (Tower 3A) and part of associated podium and U/G parking garage

    Applied Apr 3, 2024 · Permit 24 131935 HVA

    Under review
  • New building

    Phase 2 - Build 2nd tower (Tower 3A) and part of associated podium and U/G parking garage with 393 units, 31 storeys plus mechanical penthouse. Development is for creation of a mixed use development comprised of an existing office development, and three new mixed use buildings with 5 new residential towers for a total maximum gross floor area of 3.94 times the area of the lot. A maximum of 1,478 dwelling units and a total combined gross floor area of 159,779 square metres is permitted.

    Applied Apr 3, 2024 · issued Sep 10, 2026 · 393 homes added · Permit 24 131935 BLD

    Permit issued
  • Addition or alteration · Other

    Changes to existing shoring permit, south east and south face of the parking garage to change shoring system from rakers to tiebacks - 20-232683

    Applied Mar 18, 2024 · Permit 24 126782 BLD

    Under review
  • Partial permit · Partial permit - structural framing

    Part Permit - PHASE 1 - BUILD U/G PARKING GARAGE AND ONE CONDO TOWER 31 STOREY HIGH. FIRST (TOWER 2) OUT OF 5 TOTAL TOWERS. (19 238841 NNY 17 SA)

    Applied Mar 13, 2024 · completed May 15, 2025 · Permit 20 232683 STR

    Superseded
  • Conditional permit · Partial permit - foundation

    Conditional Permit - Part Permit - PHASE 1 - BUILD U/G PARKING GARAGE AND ONE CONDO TOWER 31 STOREY HIGH. FIRST (TOWER 2) OUT OF 5 TOTAL TOWERS.

    Applied Jan 16, 2024 · issued Feb 26, 2024 · completed Sep 3, 2024 · Permit 20 232683 FND

    Cancelled
  • Conditional permit · Partial permit - shoring

    Conditional Permit - Part Permit - PHASE 1 - BUILD U/G PARKING GARAGE AND ONE CONDO TOWER 31 STOREY HIGH. FIRST (TOWER 2) OUT OF 5 TOTAL TOWERS.

    Applied Mar 30, 2023 · issued Apr 24, 2023 · completed Feb 26, 2024 · Permit 20 232683 SHO

    Closed
  • Drains and site services

    Drain - PHASE 1 - BUILD U/G PARKING GARAGE AND ONE CONDO TOWER 31 STOREY HIGH. FIRST (TOWER 2) OUT OF 5 TOTAL TOWERS.

    Applied Dec 21, 2020 · issued Jul 31, 2024 · Permit 20 232683 DRN

    Inspections under way
  • Heating and ventilation

    Hvac - phase 1 - build u/g parking garage and one condo tower 31 storey high. First (tower 2) out of 5 total towers.

    Applied Dec 21, 2020 · issued Apr 3, 2025 · Permit 20 232683 HVA

    Inspections under way
  • Drains and site services · Site service

    Site Services - PHASE 1 - BUILD U/G PARKING GARAGE AND ONE CONDO TOWER 31 STOREY HIGH. FIRST (TOWER 2) OUT OF 5 TOTAL TOWERS.

    Applied Dec 21, 2020 · Permit 20 232683 STS

    Ready for issuance
  • Plumbing

    Plumbing - PHASE 1 - BUILD U/G PARKING GARAGE AND ONE CONDO TOWER 31 STOREY HIGH. FIRST (TOWER 2) OUT OF 5 TOTAL TOWERS.

    Applied Dec 21, 2020 · issued Mar 28, 2025 · Permit 20 232683 PLB

    Inspections under way
  • Demolition

    Demo existing 5 storey office building in it's entirety.

    Applied Jul 31, 2015 · issued Sep 25, 2015 · completed Apr 18, 2023 · Permit 15 200061 DEM

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Consent · Lot addition

    To obtain consent to sever a portion of land for the purpose of a lot addition to facilitate in the approved mixed-use development consisting of an existing office building and three new mixed-use buildings with five (5) residential towers.

    Decision: Approved (hearing Dec 4, 2025)

    Filed Sep 9, 2025 · File B0022/25NY

    Approved with conditions

What’s planned nearby

Development sites within 500 m

  • 1181 Sheppard Avenue East

    33 storeys · 452 homes · Mixed use

    120 m away · Site plan · Under appeal · filed Mar 10, 2022

    Under appeal
  • 4000 Leslie Street

    Mixed use

    310 m away · Site plan · Approved · filed Feb 8, 2024

    Approved
  • 1125 Sheppard Avenue East

    48 storeys · 1,238 homes · Mixed use

    350 m away · Site plan · Under review · filed Mar 21, 2024

    Under review

Neighbours’ Committee of Adjustment files within 250 m

  • 1210-1220 Sheppard Ave E · Consent

    To obtain consent to sever a portion of land for the purpose of a lot addition to facilitate in the approved mixed-use development consisting of an existing office building and three new mixed-use buildings with five (5) residential towers.

    170 m away · filed Sep 17, 2025 · Approved

  • 12 Clarinda Dr · Minor variance

    To construct a front porch addition.

    240 m away · filed Aug 31, 2018 · Approved

Everything planned in Don Valley North

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.