Toronto address · Ward 12, Toronto-St. Paul's
121 Clovelly Ave
The City of Toronto has 3 building permits since 2017 (2 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Heating and ventilation
HVAC - Proposal to construct a front two storey addition over verandah, a second storey addition, and interior alterations
Applied Mar 11, 2020 · issued Apr 16, 2020 · Permit 17 198446 HVA
- Inspections under way
Small residential project · Multiple projects
Proposal to construct a front two storey addition over verandah, a second storey addition, and interior alterations
Applied Jul 14, 2017 · issued Aug 1, 2017 · Permit 17 198446 BLD
- Closed
Plumbing
Plumbing - Proposal to construct a front two storey addition over verandah, a second storey addition, and interior alterations
Applied Jul 14, 2017 · issued Aug 1, 2017 · completed Aug 25, 2026 · Permit 17 198446 PLB
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To construct a second storey addition over the existing one-storey dwelling, in conjunction with a two-storey addition to the front of the dwelling.
Decision: Approved (hearing Apr 19, 2017)
Filed Feb 6, 2017 · File A0103/17NY
What’s planned nearby
Development sites within 500 m
- Under appeal
1675-1685 Eglinton Avenue West
37 storeys · 416 homes · Mixed use
280 m away · Rezoning · Under appeal · filed Aug 7, 2024
- Under review
42 storeys · 336 homes · Mixed use
290 m away · Site plan · Under review · filed Dec 22, 2021
- Under review
503-511 Oakwood Avenue and 66-70 Belvidere Avenue
13 storeys · 161 homes · Mixed use
290 m away · Rezoning · Under review · filed Jun 6, 2025
- Under review
40 storeys · Mixed use
300 m away · Site plan · Under review · filed Sep 23, 2022
- Under review
670-680 Northcliffe Boulevard and 775-783 Vaughan Road
39 storeys · 520 homes · Mixed use
310 m away · Site plan · Under review · filed Apr 27, 2023
- Under appeal
1711-1741 Eglinton Avenue West
39 storeys · 423 homes · Mixed use
320 m away · Rezoning · Under appeal · filed Aug 2, 2024
Neighbours’ Committee of Adjustment files within 250 m
108 Clovelly Ave · Minor variance
To construct a new four-storey detached dwelling (houseplex) with front and rear basement walkouts, front and rear porches with stairs, front and rear balconies on the second and third storeys, and front and rear terraces on the fourth storey. The second storey will be cantilevered on the west side of the dwelling. Also, to construct a new rear two-storey detached ancillary building containing one garden suite and five bicycle parking spaces. There will be a total of seven residential dwelling units on this lot (six units within the main dwelling, and one unit within the ancillary building).
60 m away · filed Feb 2, 2026 · Approved
571 Oakwood Ave · Minor variance
To construct a new three-storey apartment building containing 10 residential dwelling units, with a covered front entrance at the northwest portion of the building, 6 rooftop terraces (located at the northwest, northeast, southeast, southwest, and side (south) portions of the building above the third floor) with one rooftop staircase access enclosure. Also, to construct a one-storey detached ancillary building (bicycle storage shed) in the rear yard. The existing rear shed will be demolished.
220 m away · filed Sep 30, 2025 · Approved
118 Bude St · Minor variance
To construct a two-storey ancillary building (containing one garden suite) in the rear yard of the property. There will be a total of three residential dwelling units on this lot (two units occupying the main dwelling and one unit occupying the ancillary building). The existing sheds will be demolished.
90 m away · filed May 30, 2025 · Approved
729 Vaughan Rd · Minor variance
To construct a new three-storey detached dwelling (triplex) with rooftop terraces. Also, to construct a one-storey attached two-car garage with a rooftop terrace, fronting Greyton Crescent. There will be a total of three residential dwelling units on this lot.
150 m away · filed Jan 28, 2025 · Approved
61 Clovelly Ave · Minor variance
To construct a new three-storey semi-detached dwelling with front and rear basement patios, front and rear ground floor porch with stairs, a rear second floor balcony, and a rear third storey platform.
240 m away · filed Nov 7, 2024 · Approved
61 Clovelly Ave · Minor variance
To construct a new three-storey semi-detached dwelling with front and rear basement patios, front and rear ground floor porch with stairs, a rear second floor balcony, and a rear third storey platform.
240 m away · filed Nov 7, 2024 · Approved
61 Clovelly Ave · Consent
To obtain consent to sever the property into two undersized residential lots.
240 m away · filed Oct 28, 2024 · Approved
110 Clovelly Ave · Minor variance
To construct a new three-storey detached dwelling (fourplex) with a front covered porch, a front basement walkout, front and rear second storey balconies, front and rear third storey terraces, a rear basement walkout with terrace, a rear ground floor deck, and a rear staircase to access all levels. Also, to construct a new two-storey ancillary building (containing one garden suite which will occupy both levels), in the rear yard of the property. There will be a total of five residential dwelling units on this lot (four dwelling units within the main house and one dwelling unit within the anci…
60 m away · filed Aug 6, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.