Toronto address · Ward 9, Davenport
121 Lindsey Ave
The City of Toronto has 2 building permits since 2017 (1 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Small residential project · Addition(s)
Proposed 1 sty. Addition below existing sun deck at 2nd floor
Applied Dec 30, 2025 · issued Jan 20, 2026 · Permit 25 270775 BLD
- Closed
Small residential project · Party wall admin permits
Admin permit in conjunction with 119 Lindsey Ave
Applied Aug 11, 2016 · issued Aug 15, 2016 · completed Feb 17, 2023 · Permit 16 204999 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
1-3 Boland Lane and 646-648 Dufferin Street
8 storeys · 135 homes · Residential
380 m away · Condominium · Under review · filed Oct 12, 2021
- Approved
- Approved
9 storeys · Residential
400 m away · Rezoning · Approved · filed Mar 23, 2026
- Under review
8 storeys · 57 homes · Mixed use
420 m away · Site plan · Under review · filed Feb 15, 2023
Neighbours’ Committee of Adjustment files within 250 m
367 Brock Ave · Minor variance
100 m away · filed Jul 13, 2026 · Postponed
88 Margueretta St · Minor variance
To alter the existing two-storey townhouse dwelling by constructing a front basement walkout entry with stairs.
240 m away · filed Sep 6, 2024 · Approved
429 Brock Ave · Minor variance
To construct a new two-storey ancillary building (containing one laneway suite on both levels), in the rear yard, abutting the laneway. The existing detached garage will be demolished.
220 m away · filed May 27, 2024 · Approved
41 Muir Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear one-storey addition with a rear second storey deck above and a new rear ground floor deck. The existing rear deck with stairs will be demolished. The existing ancillary building (attached garage), in the rear yard, abutting the laneway, will be maintained and unaltered.
100 m away · filed Jan 29, 2024 · Approved
428 Brock Ave · Minor variance
To legalize and to maintain the secondary dwelling unit (in the basement), the front basement walkout, and the front porch stairs, that were constructed without an authorized building permit on the existing two-storey semi-detached dwelling.
250 m away · filed Jan 23, 2024 · Approved
744 Dufferin St · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by reconstructing and extending the rear second storey addition, and to construct a two-storey front addition, a ground floor front verandah and stairs, as well as a new front basement patio and walkout. Also, the basement will be converted into a secondary suite, and the existing garage, in the rear yard, will be demolished (and replaced with a parking pad).
190 m away · filed Oct 19, 2023 · Approved
757 Dufferin St · Minor variance
To alter the existing one-storey semi-detached ancillary building (garage) by constructing a partial ground floor front addition and a second storey addition. The existing parking space will be removed, and this building will contain one garden suite.
220 m away · filed Oct 4, 2023 · Approved
755 Dufferin St · Minor variance
To alter the existing one-storey semi-detached ancillary building (garage) by constructing a partial ground floor front addition and a second storey addition. The existing parking space will be removed, and this building will contain one garden suite.
220 m away · filed Oct 4, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.