Toronto address · Ward 9, Davenport
1212 College St
The City of Toronto has 2 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Plumbing
Plumbing - To convert front porch into enclosed mudroom addition and interior alterations to existing dwelling
Applied Oct 29, 2020 · issued Nov 20, 2020 · completed Feb 8, 2021 · Permit 20 212781 PLB
- Closed
Small residential project · Multiple projects
interior alterations to existing dwelling
Applied Oct 29, 2020 · issued Nov 19, 2020 · completed Feb 8, 2021 · Permit 20 212781 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
- Approved
9 storeys · Residential
230 m away · Rezoning · Approved · filed Mar 23, 2026
- Under review
1-3 Boland Lane and 646-648 Dufferin Street
8 storeys · 135 homes · Residential
410 m away · Condominium · Under review · filed Oct 12, 2021
- Under review
8 storeys · 57 homes · Mixed use
440 m away · Site plan · Under review · filed Feb 15, 2023
Neighbours’ Committee of Adjustment files within 250 m
367 Brock Ave · Minor variance
90 m away · filed Jul 13, 2026 · Postponed
137 Margueretta St · Minor variance
To alter the existing two- storey detached dwelling by constructing a rear second storey addition, a complete third storey addition with a rear balcony, a rear ground level porch, and a basement walkout. There will be a total of two residential dwelling units on this lot (one unit within the basement level, and one unit to occupy the first, second, and third levels).
240 m away · filed Aug 15, 2025 · Approved
163 St Clarens Ave · Minor variance
To construct a new three-storey detached dwelling (fourplex) with a front ground floor landing with stairs, a side (north) ground floor walkout, two rear ground floor landings with stairs and two third floor side (north) terraces (Unit A and Unit C). Also, to construct a new two-storey laneway suite in the rear yard with a front (west) second floor terrace. There will be a total of five dwelling units on the lot (four units within the main dwelling and one unit within the laneway suite). The existing rear detached garage will be demolished.
130 m away · filed May 13, 2025 · Approved
88 Margueretta St · Minor variance
To alter the existing two-storey townhouse dwelling by constructing a front basement walkout entry with stairs.
140 m away · filed Sep 6, 2024 · Approved
139 Margueretta St · Minor variance
To construct a one-storey ancillary building (detached garage) in the rear yard, abutting the laneway. The existing garage will be demolished.
240 m away · filed Sep 6, 2024 · Approved
191 St Clarens Ave · Minor variance
To alter the existing two-and-one-half storey semi-detached dwelling by constructing a rear third storey addition. Also, to permit the one-storey ancillary building (detached garage), in the rear yard, abutting the laneway.
150 m away · filed Dec 30, 2023 · Approved
174 Sheridan Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a one-storey rear addition (to replace the existing rear one-storey addition with stairs).
210 m away · filed Jul 29, 2023 · Approved
391 Brock Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a front partial third storey addition, with a rear second storey deck and stairs, and a rear third storey balcony. This dwelling will have one primary unit (located on the ground level) and two secondary suites (one within the basement and one on the second level).
170 m away · filed Apr 18, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.