Toronto address · Ward 22, Scarborough-Agincourt
123 Fairglen Ave
The City of Toronto has 2 building permits since 2017 (2 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Residential building permit · New building
Proposed new two storey single family dwelling - rev. #1 to to omit 2 gas fireplaces and replace with one wood burning fireplace
Applied Apr 6, 2004 · issued Apr 22, 2004 · Permit 03 143826 BLD (revision 01)
- Inspections under way
Residential building permit · New building
Proposed new two storey single family dwelling
Applied Jun 11, 2003 · issued Aug 26, 2003 · 1 home added · Permit 03 143826 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
2771-2773 Victoria Park Avenue
4 storeys · 62 homes · Residential
360 m away · Site plan · Approved · filed Dec 19, 2024
Neighbours’ Committee of Adjustment files within 250 m
128 Fairglen Ave · Minor variance
To construct a new two-storey detached dwelling (duplex) with a covered front porch and rear deck and a pool cabana in the rear yard. The existing one-storey dwelling will be demolished. There will be a total of two dwelling units on the lot.
70 m away · filed Dec 1, 2025 · Approved
99 Fairglen Ave · Consent
To obtain consent to sever the property into two residential lots.
210 m away · filed Jul 27, 2021 · Refused
99 Fairglen Ave · Minor variance
To construct a new detached dwelling.
210 m away · filed Jul 27, 2021 · Refused
99 Fairglen Ave · Minor variance
To construct a new detached dwelling.
210 m away · filed Jul 27, 2021 · Refused
112 Fairglen Ave · Minor variance
To construct a new second floor addition to the existing single family dwelling.
140 m away · filed Feb 5, 2020 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.