Toronto address · Ward 9, Davenport
1230 Lansdowne Ave
The City of Toronto has 1 building permit since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Walk-Out stair
Construct basement entrance at front, underpin portion of basement.
Applied Apr 22, 2003 · issued Apr 25, 2003 · completed Jan 28, 2026 · Permit 03 125201 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
18 storeys · 211 homes · Mixed use
460 m away · Rezoning · Under review · filed Jun 20, 2025
- Under review
21 storeys · 330 homes · Mixed use
480 m away · Rezoning · Under review · filed Dec 18, 2025
- Under review
17 storeys · 258 homes · Mixed use
480 m away · Site plan · Under review · filed Jun 24, 2022
Neighbours’ Committee of Adjustment files within 250 m
1104 St Clarens Ave · Minor variance
To construct a new one-storey detached ancillary building (containing a two-car garage), in the rear yard, abutting the laneway. The existing rear detached ancillary building (garage) will be demolished.
240 m away · filed Jul 16, 2026 · Approved
110 Greenlaw Ave · Minor variance
To construct a new one-storey detached ancillary building (containing a two-car garage), in the rear yard, abutting the laneway. The existing garage will be demolished.
240 m away · filed Jun 19, 2026 · Approved
953 St Clarens Ave · Minor variance
To construct a new two-storey detached ancillary building (containing a one-car garage on the ground floor and one garden suite on the second storey with the second storey cantilevered on the south side) in the rear yard of the lot. There will be a total of two residential dwelling units on this lot (one unit within the main three-storey detached dwelling and one unit within the ancillary building).
230 m away · filed Jul 15, 2025 · Approved
110 Greenlaw Ave · Minor variance
To construct a new two-storey detached dwelling with a front porch, a rear covered ground floor deck, a rear basement walkout, and a rear second storey rooftop deck. Also, to alter the existing one-storey ancillary building (detached garage, abutting the laneway), by increasing its overall height.
240 m away · filed Jun 19, 2025 · Approved
1036 St Clarens Ave · Minor variance
To alter the existing two-and-one-half-storey single detached dwelling by constructing a new front two-storey addition (porch and basement walkout with stairs), a front and side (south) cantilevered second storey addition, and a complete third storey addition.There will be two residential dwelling units within this dwelling (duplex).
110 m away · filed Sep 15, 2024 · Approved
998 St Clarens Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a front one-storey addition, a complete third storey cantilevered addition, with a front ground floor balcony, a front second storey balcony, a front third storey terrace, a rear ground floor juliette balcony, a front basement walkout with a terrace, and rear second and third storey terraces and stairs. This dwelling will contain four dwelling units. Also, the rear existing basement walkout will be maintained and unaltered.
110 m away · filed Apr 25, 2023 · Approved
1228 Lansdowne Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a third storey dormer addition and a rear rooftop deck.
10 m away · filed Mar 30, 2023 · Approved
966 St Clarens Ave · Minor variance
To permit the construction of a front basement walk-out entrance for the purposes of a secondary suite.
170 m away · filed Dec 13, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.