Toronto address · Ward 9, Davenport
1232 St Clair Ave W
The City of Toronto has 4 building permits since 2017 (4 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Permit issued
Heating and ventilation
HVAC - Proposed interior alterations to basement and ground floor to convert existing retail space to a personal service shop.
Applied Jul 28, 2026 · issued Sep 4, 2026 · Permit 26 210175 HVA
- Inspections under way
Addition or alteration · Interior alterations
Proposed interior alterations to basement and ground floor to convert existing retail space to a clinic (RMT, Chiro, Physio)
Applied Jul 28, 2026 · issued Sep 4, 2026 · Permit 26 210175 BLD
- Permit issued
Plumbing
Plumbing - Proposed interior alterations to basement and ground floor to convert existing retail space to a personal service shop.
Applied Jul 28, 2026 · issued Sep 21, 2026 · Permit 26 210175 PLB
- Inspections under way
Addition or alteration · Other
Demolish existing rear shed and construct a new rear fire exit staircase.
Applied Jul 15, 2025 · issued Oct 27, 2025 · Permit 25 194112 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
120 Mackay Ave · Minor variance
To construct a new two-storey detached ancillary building (containing one laneway suite), in the rear yard, abutting the laneway. This ancillary building will have a partially cantilevered second storey (at the west portion of the building), and canopies at the north and south sides of the building. There will be a total of five residential dwelling units on this lot (four units within the main detached dwelling and one unit within the ancillary building).
190 m away · filed Feb 6, 2026 · Approved
93 Mackay Ave · Minor variance
To alter the existing one-storey ancillary building (detached garage, in the rear yard, abutting the laneway) by constructing a complete second storey addition for the purposes of constructing one laneway suite. The existing parking space will be maintained.
180 m away · filed Jan 15, 2024 · Approved
70 Boon Ave · Minor variance
To construct a parking pad in the front yard of the existing two-and-one-half-storey semi-detached dwelling.
230 m away · filed Mar 28, 2023 · Withdrawn
51 Ascot Ave · Minor variance
To convert the existing one-storey ancillary building (detached garage in the rear yard, abutting St. Clair Gardens) into a two-storey ancillary building (containing a two-car garage on the ground level, and one garden suite that will occupy the second level), by constructing a complete second storey addition with two second storey side (west) juliette balconies. There will be a total of two residential dwelling units on this lot (one unit within the main dwelling and one unit within the ancillary building).
210 m away · filed Oct 28, 2022 · Approved
26 Mackay Ave · Minor variance
To legalize and to maintain the existing rear detached garage which was constructed without the benefit of a permit.
140 m away · filed May 10, 2022 · Approved
156 Rosemount Ave · Minor variance
To legalize and maintain a front basement walkout of the existing 2½-storey semi-detached dwelling.
210 m away · filed Oct 5, 2021 · Approved
43 Norton Ave · Minor variance
To construct a rear detached garage.
70 m away · filed Aug 25, 2021 · Refused
53 Boon Ave · Minor variance
To alter the existing 2½-storey semi-detached dwelling by constructing: a partial second storey addition; a third storey addition; a front basement walkout; front and rear second storey balconies; and a rear third storey balcony. Also, this dwelling will contain 4 dwelling units (1 primary and 3 secondary suites).
140 m away · filed Jun 30, 2021 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.