Toronto address · Ward 14, Toronto-Danforth
124 Alton Ave
The City of Toronto has 3 building permits since 2017 (3 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Small residential project · Multiple projects
Proposed basement underpinning and interior alterations.
Applied Jun 16, 2026 · issued Jun 19, 2026 · Permit 26 185587 BLD
- Permit issued
Plumbing
Plumbing - Proposed basement underpinning and interior alterations.
Applied Jun 16, 2026 · issued Jun 19, 2026 · Permit 26 185587 PLB
- Permit issued
Drains and site services
Drain - Proposed basement underpinning and interior alterations.
Applied Jun 16, 2026 · issued Jun 19, 2026 · Permit 26 185587 DRN
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
1233-1243 Queen Street East and 77 Leslie Street
9 storeys · 142 homes · Mixed use
440 m away · Site plan · Approved · filed Mar 17, 2022
- Under review
1291-1311 Gerrard Street East and 243-247 Greenwood Avenue
12 storeys · 289 homes · Mixed use
470 m away · Site plan · Under review · filed May 4, 2023
- Approved
7 storeys · 227 homes · Residential
480 m away · Site plan · Approved · filed Dec 23, 2022
Neighbours’ Committee of Adjustment files within 250 m
1 Sawden Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear second storey addition with a balcony.
140 m away · filed Apr 26, 2025 · Approved
25 Parkfield Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear two-storey addition with rear ground floor stairs. The existing rear ground floor deck and stairs will be demolished.
210 m away · filed Apr 23, 2025 · Approved
203 Leslie St · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a rear two-storey addition, a third storey addition, and a new front porch. Also, to maintain the existing rear yard parking spaces (two spaces).
170 m away · filed Nov 12, 2024 · Approved
43 Hastings Ave · Minor variance
To legalize and to maintain the front porch, which was constructed without an authorized building permit.
220 m away · filed Oct 8, 2024 · Approved
1554 Dundas St E · Minor variance
To alter the existing two-storey detached dwelling by constructing a front two-storey addition and a rear third storey addition (attic extension for additional habitable space). Also, to permit the existing rear one-storey basement walkout enclosure that was constructed without an authorized building permit.
100 m away · filed Feb 8, 2024 · Approved
1492 Dundas St E · Minor variance
This lot contains two three-storey apartment buildings with a total of 16 dwelling units (1480 and 1492 Dundas Street East), one two-storey fourplex detached building (1492 R Dundas Street East), and 22 surface parking spaces. To construct four basement dwelling units (two units in each apartment building), therefore, there will be a total of 24 dwelling units on this lot.
240 m away · filed Sep 19, 2023 · Approved
180 Alton Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a third storey addition.
200 m away · filed May 25, 2023 · Approved
52 Hiltz Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition to replace the existing rear one-storey portion of the dwelling, a rear ground floor covered deck, a rear second storey deck, and a new front porch and stairs. Also, to enclose the front verandah for additional habitable space.
240 m away · filed May 12, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.