Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 4, Parkdale-High Park

124 Ardagh St

The City of Toronto has 2 building permits since 2017 (2 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    **REVISION to heating design** HVAC - rear one storey addition as approved by c/o/a 447/07

    Applied Nov 5, 2007 · issued Nov 5, 2007 · Permit 07 263026 HVA (revision 01)

    Revision issued
  • Heating and ventilation

    HVAC - rear one storey addition as approved by c/o/a 447/07

    Applied Sep 19, 2007 · issued Oct 10, 2007 · Permit 07 263026 HVA

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 462 Willard Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear two-storey addition with basement extension below and new stairs to grade. Also, to enclose a portion of the front porch (north side) for a new foyer and relocate the front porch stairs (south side). The existing rear one-storey addition will be demolished.

    100 m away · filed Aug 25, 2025 · Approved

  • 321 Jane St · Minor variance

    To alter the existing two-storey mixed-use building by constructing a two-storey rear addition, a front second storey walkout balcony, a complete third storey addition with a front balcony, and a fourth storey addition (mechanical penthouse) with front and rear walkout balconies.

    220 m away · filed Mar 14, 2024 · Approved

  • 699 Annette St · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear three-storey addition, a rear ground floor landing with stairs, and a rear third floor roof walkout deck. There will be a total of two dwelling units within the building.

    250 m away · filed Sep 7, 2023 · Approved

  • 158 Ardagh St · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear two-storey addition. The existing detached garage, in the rear yard, will be demolished.

    190 m away · filed Apr 26, 2022 · Approved

  • 88 Ardagh St · Minor variance

    To alter the existing two-storey detached dwelling by constructing a new two-storey addition on the west side of the property (fronting Windermere Avenue).

    160 m away · filed Nov 22, 2021 · Approved

  • 497 Willard Ave · Minor variance

    To convert the existing two-storey, detached dwelling to a three-unit, detached dwelling by constructing a rear two-storey addition, a rear balcony and a front basement walkout. A rear two-storey laneway suite will also be constructed.

    220 m away · filed May 6, 2021 · Application withdrawn

  • 265 Jane St · Minor variance

    To alter the existing one-storey commercial building, containing a dental clinic, by constructing a full second-storey commercial addition with a mezzanine for office space, a roof-top deck, and a front two-storey addition.

    210 m away · filed Feb 16, 2021 · Approved

  • 265 Jane St · Minor variance

    210 m away · filed Dec 30, 2020 · Application withdrawn

Everything planned in Parkdale-High Park

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.