Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 25, Scarborough-Rouge Park

125 Colonel Danforth Trl

The City of Toronto has 5 building permits since 2017 (4 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - Proposal to demolish existing dwelling to be replaced by new storey single family dwelling with finished basement and integrated garage.

    Applied Jun 15, 2018 · issued Jun 27, 2018 · Permit 18 165204 HVA

    Inspections under way
  • Drains and site services

    Drain - Proposal to demolish existing dwelling to be replaced by new storey single family dwelling with finished basement and integrated garage.

    Applied May 25, 2018 · issued Jun 14, 2018 · Permit 18 165204 DRN

    Inspections under way
  • Plumbing

    Plumbing - Proposal to demolish existing dwelling to be replaced by new storey single family dwelling with finished basement and integrated garage.

    Applied May 25, 2018 · issued Jun 14, 2018 · Permit 18 165204 PLB

    Inspections under way
  • New house · New building

    Proposal to demolish existing dwelling to be replaced by new storey single family dwelling with finished basement and integrated garage.

    Applied May 25, 2018 · issued Jun 14, 2018 · 1 home added · Permit 18 165204 BLD

    Inspections under way
  • Demolition

    Proposal to demolish existing dwelling to be replaced by new storey single family dwelling with finished basement and integrated garage.

    Applied May 25, 2018 · issued Jun 15, 2018 · completed Oct 27, 2021 · 1 home removed · Permit 18 165228 DEM

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · New R building

    To construct a new two-storey detached dwelling.

    Decision: Approved (hearing Mar 22, 2018)

    Filed Jun 8, 2017 · File A0201/17SC

    Closed

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 5 Wanita Rd · Minor variance

    To permit the construction of a new, two-storey detached dwelling. This application is to be jointly considered with Consent Application B0025/20SC and Minor Variance Application A0155/20SC.

    240 m away · filed Jul 10, 2020 · Approved

  • 5 Wanita Rd · Minor variance

    To permit the construction of a new, two-storey detached dwelling. This application is to be jointly considered with Consent Application B0025/20SC and Minor Variance Application A0154/20SC.

    240 m away · filed Jul 10, 2020 · Approved

  • 5 Wanita Rd · Consent

    For a consent to sever the property into two residential lots with each lot to be developed with a new 2-storey detached dwelling. Each lot (retained and conveyed) will have minimum lot frontages of 13.71 metres and minimum lot areas of 417.8 square metres. This proposal requires variances to the Zoning By-law. Cross-Reference Minor Variance Applications A0154/20SC and A0155/20SC. The consent application and minor variance applications are to be jointly considered by the Committee of Adjustment.

    240 m away · filed Jul 10, 2020 · Approved

Everything planned in Scarborough-Rouge Park

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.