Toronto address · Ward 7, Humber River-Black Creek
125 Ormont Dr
The City of Toronto has 6 building permits since 2017 (4 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Permit issued
Drains and site services
Drain - Second floor addition above existing building, demolish rear second floor, interior alterations to ground floor at rear building and relocate existing temporary white dome
Applied Jan 12, 2021 · issued Apr 24, 2023 · Permit 21 100434 DRN
- Inspections under way
Plumbing
Plumbing - Second floor addition above existing building, demolish rear second floor, interior alterations to ground floor at rear building and relocate existing temporary white dome
Applied Jan 4, 2021 · issued Apr 24, 2023 · Permit 21 100434 PLB
- Inspections under way
Heating and ventilation
HVAC - Second floor addition above existing building, demolish rear second floor, interior alterations to ground floor at rear building and relocate existing temporary white dome
Applied Jan 4, 2021 · issued Apr 24, 2023 · Permit 21 100434 HVA
- Inspections under way
Addition or alteration · Addition(s)
Second floor addition above existing building, demolish rear second floor, interior alterations to ground floor at rear building and relocate existing temporary white dome
Applied Jan 4, 2021 · issued Nov 8, 2022 · Permit 21 100434 BLD
- Closed
Plumbing · Backflow prevention devices (Water only)
Proposed installation of (1) backflow prevention device into an existing retail store.
Applied Dec 6, 2011 · issued Dec 19, 2011 · completed Jul 24, 2025 · Permit 11 321675 PSA
- Closed (dormant)
Addition or alteration · Interior alterations
exterior alters to existing shipping door from two doors to one and interior alters
Applied Aug 13, 2004 · issued Oct 18, 2004 · completed Jun 8, 2026 · Permit 04 166032 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
Neighbours’ Committee of Adjustment files within 250 m
None on file since 2017.
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.