Toronto address · Ward 11, University-Rosedale
1257 Yonge St
The City of Toronto has 4 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Plumbing · Backflow prevention devices (Water only)
Proposal to install a backwater valve in an existing office buiding.Convenience address is 1255 Yonge St.
Applied Jun 12, 2017 · issued Jul 6, 2017 · completed Oct 27, 2020 · Permit 17 177866 PSA
- Closed
Fire and security upgrade · Fire alarm
Proposal to install 2 interior doors on the ground floor of existing office building "Cineplex" (5m2) and relocate fire alarm panel.
Applied Oct 2, 2013 · issued Oct 18, 2013 · completed Feb 10, 2021 · Permit 13 245156 FSU
- Closed
Fire and security upgrade · Electromagnetic locks
Proposal to install 1 electromagnetic lock within "Cineplex" on the first floor. Convenience address of 1255 Yonge St.
Applied May 24, 2013 · issued Jun 18, 2013 · completed Jan 13, 2021 · Permit 13 174035 FSU
- Closed
Fire and security upgrade · Electromagnetic locks
This is for the installation of four(4) electromagnetic locks, three(3) on the ground floor and one(1) in the basement. This is for Cineplex Entertainment offices.
Applied Jun 5, 2012 · issued Jun 28, 2012 · completed Jan 13, 2021 · Permit 12 186684 FSU
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
47 storeys · 832 homes · Mixed use
10 m away · Site plan · Under review · filed Apr 12, 2022
- Under review
9 Woodlawn Avenue East and 1233 Yonge Street
49 storeys · 724 homes · Mixed use
60 m away · Site plan · Under review · filed Dec 29, 2021
- Under review
- Under review
41 storeys · 489 homes · Mixed use
230 m away · Site plan · Under review · filed Sep 2, 2022
- Under review
22 storeys · 185 homes · Mixed use
280 m away · Site plan · Under review · filed Aug 31, 2022
- Under review
14 storeys · 67 homes · Mixed use
300 m away · Condominium · Under review · filed Nov 18, 2021
Neighbours’ Committee of Adjustment files within 250 m
67 Summerhill Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a front covered porch with stairs.
250 m away · filed Jul 29, 2026 · Hearing scheduled
1262 Yonge St · Minor variance
To permit an eating establishment use (restaurant) that is occupying the ground floor area of the existing three-storey mixed-use building. The existing two residential dwelling units (occupying the second and third levels) will be maintained and unaltered.
100 m away · filed Apr 23, 2026 · Approved
38 Walker Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition, a partial third storey addition with a rear deck, a rear ground level deck with stairs, and a new front porch with stairs. The existing rear one-storey detached ancillary building (storage area) will be maintained and unaltered.
250 m away · filed Jan 2, 2026 · Approved
1177 Yonge St · Minor variance
To alter the development standards (as approved under Site Specific Zoning By-law 286-83) for the seven-storey mixed-use condominium building, by reducing the number of parking spaces required off-site. The existing on-site underground parking spaces on Parking Levels P1, P2, and P3 will be maintained and unaltered. There will be a total of 182 parking spaces provided on-site, therefore, there is no longer a need to lease parking spaces from the Toronto Transit Commission (TTC) site in Area "D".
200 m away · filed Sep 2, 2025 · Approved
1155 Yonge St · Minor variance
To alter the development standards (as approved under Site Specific Zoning By-law 286-83) for the six-storey office building, by reducing the number of parking spaces required off-site. The existing on-site underground parking spaces on Parking Levels P1 and P2 will be maintained and unaltered. There will be a total of 47 parking spaces provided on-site, therefore, there is no longer a need to lease parking spaces from the Toronto Transit Commission (TTC) site in Area "D".
230 m away · filed Jul 11, 2025 · Approved
49 Woodlawn Ave E · Minor variance
To legalize and to maintain the rear ground floor deck, which was constructed without an authorized building permit.
220 m away · filed Dec 27, 2024 · Approved
48 Woodlawn Ave W · Minor variance
To alter the existing two-storey detached dwelling by converting the rear second storey balcony and cantilevered addition into habitable space. The additional rear second storey balcony will be maintained.
210 m away · filed Sep 10, 2024 · Approved
37 Woodlawn Ave W · Minor variance
To alter the existing three-storey semi-detached dwelling by constructing a front third storey dormer addition, and rear third storey Juliet balconies. The existing rear ground floor deck will also be extended towards the rear (south) lot line.
180 m away · filed Feb 12, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.