Toronto address · Ward 8, Eglinton-Lawrence
127 Douglas Ave
The City of Toronto has 7 building permits since 2017 (1 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation
HVAC - Proposal for a rear two storey addition with a new rear deck for an existing two storey single family dwelling. Scope includes interior alterations and basement underpining.
Applied Nov 15, 2021 · issued Nov 22, 2021 · completed Dec 2, 2025 · Permit 21 185673 HVA
- Closed
Drains and site services
Drain - Proposal for a rear two storey addition with a new rear deck for an existing two storey single family dwelling. Scope includes interior alterations and basement underpining.
Applied Jul 17, 2021 · issued Sep 24, 2021 · completed Dec 2, 2025 · Permit 21 185673 DRN
- Closed
Plumbing
Plumbing - Proposal for a rear two storey addition with a new rear deck for an existing two storey single family dwelling. Scope includes interior alterations and basement underpining.
Applied Jul 17, 2021 · issued Sep 24, 2021 · completed Dec 2, 2025 · Permit 21 185673 PLB
- Inspections under way
Small residential project · Multiple projects
Proposal for a rear two storey addition with a new rear deck for an existing two storey single family dwelling. Scope includes interior alterations and basement underpining.
Applied Jul 17, 2021 · issued Sep 24, 2021 · Permit 21 185673 BLD
- Closed
Small residential project · Multiple projects
Alter BP 03 119706 by reducing size of front porch and clearly identifying size of beam on 2nd floor.
Applied Aug 5, 2003 · issued Aug 20, 2003 · completed Dec 2, 2025 · Permit 03 119706 BLD (revision 01)
- Closed
Plumbing
Plumbing - Fixtures
Applied Apr 1, 2003 · issued May 22, 2003 · completed Dec 2, 2025 · Permit 03 119706 PLB
- Closed
Small residential project · Multiple projects
Construct rear 2 storey addition; construct platform at rear; reduce existing platform at front.
Applied Apr 1, 2003 · issued May 22, 2003 · completed Dec 2, 2025 · Permit 03 119706 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To construct a two-storey addition to the rear of the existing dwelling, in conjunction with other interior and exterior alterations.
Decision: Approved (hearing Apr 28, 2021)
Filed Feb 22, 2021 · File A0123/21NY
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
212 Douglas Ave · Minor variance
To construct a new detached dwelling with an integral garage.
240 m away · filed Feb 20, 2026 · Approved
90 Douglas Ave · Minor variance
To construct a new laneway suite.
140 m away · filed Jul 2, 2025 · Refused
239 Bedford Park Ave · Minor variance
To construct a second storey addition to the existing detached garage and convert into a Laneway Suite.
170 m away · filed Apr 9, 2025 · Approved
163 Bedford Park Ave · Minor variance
To rebuild a new front porch using the existing footprint. Construction will also include a partial enclosure of the front porch.
120 m away · filed Mar 24, 2025 · Approved
243 Bedford Park Ave · Minor variance
To construct a new detached dwelling.
180 m away · filed Dec 30, 2024 · Approved
193 Bedford Park Ave · Minor variance
To construct a new detached dwelling with a new rear carport.
100 m away · filed May 23, 2024 · Approved
208 Douglas Ave · Minor variance
To construct a new detached dwelling with a detached garage in the rear yard..
220 m away · filed May 18, 2024 · Approved
168 Bedford Park Ave · Minor variance
To construct a new dwelling and laneway suite.
150 m away · filed Apr 24, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.