Toronto address · Ward 20, Scarborough Southwest
129 Claremore Ave
The City of Toronto has 4 building permits since 2017 (4 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Heating and ventilation
HVAC - Proposal to construct a new 2nd floor addition, interior alterations and reconstruct the porch at the front of an existing SFD-detached dwelling. See also 23 136774 ZAP.
Applied Aug 18, 2023 · issued Aug 22, 2023 · Permit 23 160707 HVA
- Inspections under way
Drains and site services
Drain - includes a backwater valveProposal to construct a new 2nd floor addition, interior alterations and reconstruct the porch at the front of an existing SFD-detached dwelling. See also 23 136774 ZAP.
Applied Jun 14, 2023 · issued Jul 5, 2023 · Permit 23 160707 DRN
- Inspections under way
Plumbing
Plumbing - Proposal to construct a new 2nd floor addition, interior alterations and reconstruct the porch at the front of an existing SFD-detached dwelling. See also 23 136774 ZAP.
Applied Jun 14, 2023 · issued Jul 5, 2023 · Permit 23 160707 PLB
- Inspections under way
Small residential project · Multiple projects
Proposal to construct a new 2nd floor addition, interior alterations and reconstruct the porch at the front of an existing SFD-detached dwelling. See also 23 136774 ZAP.
Applied Jun 14, 2023 · issued Jul 5, 2023 · Permit 23 160707 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
Neighbours’ Committee of Adjustment files within 250 m
54 Park St · Consent
To obtain consent to sever the property into two residential lots. The existing one-storey detached dwelling will be demolished. NOTE: The Committee of Adjustment previously approved the severance of the land into two residential lots in 2022 under Decision B0020/21SC. However, the provisional consent of this consent application lapsed because the conditions were not satisfied within the statutory deadline. NOTE: This application was previously deferred at the Committee of Adjustment Hearing on December 3, 2025.
140 m away · filed Aug 27, 2025 · Approved
54 Park St · Minor variance
To construct a new two-storey detached dwelling (duplex) with a front porch, rear deck, front balcony and rear balcony. The existing one-storey detached dwelling will be demolished. NOTE: This application was previously deferred at the Committee of Adjustment Hearing on December 3, 2025.
140 m away · filed Aug 18, 2025 · Approved
54 Park St · Minor variance
To construct a new two-storey detached dwelling (duplex) with a front yard porch, front balcony and rear balcony. The existing one-storey detached dwelling will be demolished. NOTE: This application was previously deferred at the Committee of Adjustment Hearing on December 3, 2025.
140 m away · filed Aug 18, 2025 · Approved
109 Vanbrugh Ave · Minor variance
To convert the existing garage in the rear yard of the property into a new one-storey ancillary building (garden suite).
120 m away · filed Feb 24, 2025 · Approved
448 Aylesworth Ave · Minor variance
To construct a second story addition to the existing rear yard detached garage.
210 m away · filed Aug 12, 2024 · Approved
71 Vanbrugh Ave · Consent
To sever a portion of the lot for the purposes of a lot addition. Cross-Reference B0004/24SC, A0028/24SC, A0029/24SC and A0030/24SC.
240 m away · filed Feb 29, 2024 · Approved
71 Vanbrugh Ave · Minor variance
To construct a detached 2-storey duplex. Cross-Reference B0004/24SC, B0013/24SC, A0028/24SC and A0029/24SC.
240 m away · filed Jan 5, 2024 · Approved
71 Vanbrugh Ave · Consent
To sever a portion of the lot for the purposes of a lot addition. Cross-Reference B0013/24SC, A0028/24SC, A0029/24SC and A0030/24SC.
240 m away · filed Jan 5, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.