Toronto address · Ward 19, Beaches-East York
13 Selwood Ave
The City of Toronto has 1 building permit since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Party wall admin permits
Admin permit related to work being completed at 15 Selwood
Applied Dec 7, 2019 · issued Jan 7, 2020 · completed Nov 16, 2022 · Permit 19 258385 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
25 Selwood Ave · Minor variance
To construct a new one-storey detached ancillary building (one-car garage), in the rear yard.
50 m away · filed Sep 1, 2026 · Postponed
34 Balsam Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear second storey addition (above a portion of the existing rear ground floor) with a new roof (for the remaining portion of the existing rear ground floor), and a new rear ground floor deck with stairs. The existing rear ground floor deck will be demolished.
190 m away · filed Aug 25, 2025 · Approved
29 Maclean Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a partial front third storey addition (for habitable space).
110 m away · filed Jul 30, 2025 · Approved
34 Fernwood Park Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing an integral garage, a partial third storey addition, a rear basement walkout, and a rear first level deck. The front porch will be reconstructed with a canopy and stairs. There will be a total of two residential dwelling units (duplex) on this lot (one unit within the basement level, and one unit to occupy the first, second, and third levels).
250 m away · filed Jul 28, 2025 · Approved
34 Fernwood Park Ave · Minor variance
To alter the existing three-storey semi-detached duplex dwelling (basement level is considered the first storey) by constructing an integral garage, a partial fourth storey addition, a rear second level deck, a raised front porch with stairs and canopy, and front and rear basement walkouts. There will be a total of two residential dwelling units on this lot (one unit within the basement level, and one unit occupying the second, third, and fourth levels).
250 m away · filed Jun 2, 2025 · Refused
16 Hammersmith Ave · Minor variance
To maintain the existing two-storey semi-detached dwelling (fourplex). Also, the existing ancillary building (carport for one parking space) will be maintained and unaltered. This carport is partially located on the south abutting lands (municipally known as 14 Hammersmith Avenue). The rear shed will be demolished.
240 m away · filed May 13, 2025 · Approved
14 Hammersmith Ave · Minor variance
To maintain the existing two-storey semi-detached dwelling (fourplex). Also, the existing ancillary building (carport for two parking spaces) will be maintained and unaltered. The rear shed will be demolished.
240 m away · filed May 13, 2025 · Approved
99 Scarboro Beach Blvd · Minor variance
To alter the existing two-storey semi-detached dwelling by replacing the existing rear one-storey addition and decks with a new two-storey addition (including a basement level, and a first level deck with stairs). The existing covered front porch with stairs will be maintained and unaltered.
220 m away · filed Apr 30, 2025 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.