Toronto address · Ward 11, University-Rosedale
130 Cumberland St
The City of Toronto has 8 building permits since 2017 (3 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Fire and security upgrade · Sprinklers
Proposed to install13 new sprinkler head in existing coffee shop to meet city comments cithy related to existing permit 16-101377 BLD.
Applied Feb 3, 2023 · issued Mar 3, 2023 · completed Jul 28, 2023 · Permit 23 109935 FSU
- Closed
Addition or alteration · Interior alterations
Revision 01: Revised electrical closed as per bubbled drawingRestore exit corridor in 2nd basement level, install smoke detector within corridor space
Applied Jul 7, 2017 · issued Jul 26, 2017 · completed Dec 5, 2018 · Permit 16 141184 BLD (revision 01)
- Closed
Addition or alteration · Interior alterations
Restore exit corridor in 2nd basement level, install smoke detector within corridor space
Applied Apr 15, 2016 · issued Apr 29, 2016 · completed Dec 5, 2018 · Permit 16 141184 BLD
- Closed
Heating and ventilation
HVAC - Proposed interior alterations for coffee shop.
Applied Jan 6, 2016 · issued Mar 24, 2016 · completed Oct 4, 2022 · Permit 16 101377 HVA
- Closed
Addition or alteration · Interior alterations
Proposed interior alterations for a restaurant (coffee shop) in the basement level with a Maximun occupant load of 35 people including staff (30 Patrons + 5 Staff).
Applied Jan 6, 2016 · issued Mar 24, 2016 · completed Jun 8, 2023 · Permit 16 101377 BLD
- Inspections under way
Plumbing
Plumbing - Interior alterations to ground floor retail space. New tenant - "Holly Optical".
Applied Mar 3, 2015 · issued Mar 23, 2015 · Permit 15 123170 PLB
- Inspections under way
Addition or alteration · Interior alterations
Interior alterations to ground floor retail space. New tenant - "Holly Optical".
Applied Mar 3, 2015 · issued Mar 23, 2015 · Permit 15 123170 BLD
- Inspections under way
Heating and ventilation
HVAC - Interior alterations to ground floor retail space. New tenant - "Holly Optical".
Applied Mar 3, 2015 · issued Mar 23, 2015 · Permit 15 123170 HVA
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under appeal
29 storeys · 143 homes · Mixed use
120 m away · Site plan · Under appeal · filed Dec 29, 2021
- Under review
78 storeys · 1,716 homes · Mixed use
160 m away · Site plan · Under review · filed Aug 11, 2023
- Under review
Not stated in the file
160 m away · Subdivision · Under review · filed Sep 24, 2021
- Under review
188-200 Cumberland Street, 135-155 Yorkville Avenue and 21 Avenue Road
Not stated in the file
170 m away · Condominium · Under review · filed Jul 2, 2024
- Under appeal
80 storeys · 1,144 homes · Mixed use
180 m away · Site plan · Under appeal · filed Dec 17, 2021
- Under review
35 storeys · 357 homes · Mixed use
210 m away · Site plan · Under review · filed Sep 17, 2021
Neighbours’ Committee of Adjustment files within 250 m
1235 Bay St · Minor variance
To alter the development standards for the mixed-use development (approved a northern building height of 35-storeys (124.5 m) under Site Specific Zoning By-law 302-2023), and increased to 39-storeys (135.5 m as approved under Minor Variance Decision A0018/24TEY), by further increasing the northern building height to 44-storeys (142.75 m, excluding the mechanical penthouse) inclusive of an 11-storey podium base building (38.65 m), increasing the maximum gross floor area, residential gross floor area, and reducing the outdoor amenity spaces. Also, the existing 10-storey office building (located…
230 m away · filed Aug 11, 2026 · Hearing scheduled
33 Avenue Rd · Minor variance
To alter the development standards for the mixed-use building (as approved under Site Specific Zoning By-law 687-2021 (amended under City Wide Zoning By-law 569-2013)), by increasing the height of certain roof elements by 0.8 metres, and increasing the non-residential and residential gross floor areas. The overall building height (including the mechanical penthouse) will be 143.2 m. There will be a total of 323 rental residential dwelling units on this lot.
190 m away · filed Jul 28, 2026 · Hearing scheduled
6 St Thomas St · Consent
To obtain consent to create new stratified easements/rights-of-way and to maintain existing easements/rights-of-way.
250 m away · filed May 26, 2026 · Hearing scheduled
106 Scollard St · Minor variance
To alter the existing residential dwelling unit by converting it into two separate residential dwelling units (occupying the second and third storeys of the existing three-storey mixed-use building). Also, to extend the existing commercial unit (currently occupying the ground floor) into the basement.
180 m away · filed Mar 19, 2026 · Approved
80 Scollard St · Minor variance
To permit a massage therapy use on a portion of the ground floor area of the three-storey mixed-use building. The existing recreation use (pilates studio occupying the basement floor), office units (occupying the remaining portion of the ground floor, and the entire second floor), and one residential dwelling unit (occupying the entire third floor) will be maintained and unaltered.
210 m away · filed Mar 12, 2026 · Approved
55 Avenue Rd · Minor variance
To convert the retail space (located on the east side of the concourse lower level) into a single eating establishment/individual restaurant use.
200 m away · filed Dec 6, 2024 · Approved
105 Scollard St · Minor variance
To increase the indoor seating capacity from 28 seats to 44 seats. Also, to maintain the outdoor patio seating capacity of 44 seats.
150 m away · filed Nov 13, 2024 · Refused
128 Cumberland St · Minor variance
To alter the existing three storey commercial building by constructing a new exit stair on the roof.
10 m away · filed Oct 30, 2024 · Application withdrawn
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.