Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 6, York Centre

130 Faywood Blvd

The City of Toronto has 5 building permits since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - two storey dwelling (348 msq ABOVE GRADE 124.2 msq BELOW)

    Applied Jun 1, 2017 · issued Jun 22, 2017 · completed May 31, 2018 · Permit 17 151214 HVA

    Closed
  • Plumbing

    Plumbing - two storey dwelling (348 msq ABOVE GRADE 124.2 msq BELOW)

    Applied Jun 1, 2017 · issued Jun 2, 2017 · completed May 31, 2018 · Permit 17 151214 PLB

    Closed
  • Drains and site services

    Drain - two storey dwelling (348 msq ABOVE GRADE 124.2 msq BELOW)

    Applied Jun 1, 2017 · issued Jun 2, 2017 · completed Feb 27, 2019 · Permit 17 151214 DRN

    Closed
  • New house · New building

    two storey dwelling (348 msq ABOVE GRADE 124.2 msq BELOW)

    Applied Apr 28, 2017 · issued May 15, 2017 · completed Feb 13, 2019 · 1 home added · Permit 17 151214 BLD

    Closed
  • Demolition

    Demolition of exsiting single family dwelling

    Applied Apr 28, 2017 · issued May 15, 2017 · completed Aug 10, 2017 · Permit 17 151220 DEM

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · New R building

    To construct a new detached residential dwelling.

    Hearing Mar 23, 2017

    Filed Jan 24, 2017 · File A0053/17NY

    Closed

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 117 Palm Dr · Minor variance

    To construct a new 2-storey detached dwelling with an integral garage.

    220 m away · filed Nov 27, 2025 · Approved

  • 118 Palm Dr · Minor variance

    To construct a new detached dwelling with a front porch and rear second storey balcony.

    240 m away · filed Oct 21, 2025 · Approved

  • 100 King High Ave · Minor variance

    To construct a new two-storey dwelling.

    170 m away · filed Sep 30, 2025 · Approved

  • 155 Faywood Blvd · Minor variance

    To construct a second storey and two-storey addition to the existing dwelling, in conjunction with other interior and exterior alterations.

    210 m away · filed Jul 9, 2025 · Approved

  • 8 Geddes Crt · Minor variance

    To construct a second storey addition to the existing dwelling.

    160 m away · filed May 1, 2025 · Approved

  • 15 Sunbeam Ave · Minor variance

    Proposal to construct a 2 storey dwelling with a portico, uncovered porch and rear covered deck.

    240 m away · filed Dec 19, 2023 · conditional approval

  • 5 Josephine Rd · Minor variance

    Proposal to construct a new dwelling.

    220 m away · filed Aug 8, 2023 · Approved on condition

  • 109 Laurelcrest Ave · Minor variance

    Proposal for a rear covered deck and front canopy.

    230 m away · filed May 2, 2023 · Approved

Everything planned in York Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.