Toronto address · Ward 14, Toronto-Danforth
130 Heward Ave
The City of Toronto has 1 building permit since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Other
Party wall construction @ 132 Heward av
Applied Aug 7, 2007 · issued Aug 7, 2007 · completed Mar 18, 2026 · Permit 07 250622 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under appeal
- Approved
9 storeys · 78 homes · Mixed use
260 m away · Site plan · Approved · filed May 3, 2023
- Approved
462 Eastern Avenue and 150 Logan Avenue
1 storeys · Residential
320 m away · Condominium · Approved · filed Oct 21, 2024
Neighbours’ Committee of Adjustment files within 250 m
103 Morse St · Minor variance
220 m away · filed Sep 16, 2026 · Accepted
929 Queen St E · Minor variance
To alter the development standards for the 9-storey mixed-use building (35 m in height to the top of the mechanical penthouse) containing commercial uses on the ground and mezzanine floors with side (west) second-floor terraces and a side (east) rooftop amenity terrace (approved under Site Specific Zoning By-Law 291-2024), by increasing the metric height of the first, second, sixth, and eighth storeys (by 0.7 m, 2.45 m, 0.5 m, and 0.4 m respectively), with a maximum building height of 35 m to the top of the ninth storey (excluding the mechanical penthouse). Also, to increase the total gross f…
250 m away · filed Apr 15, 2026 · Approved
140 Carlaw Ave · Minor variance
To alter the existing two-storey townhouse by reconstructing and enclosing the existing front porch with stairs.
110 m away · filed Feb 24, 2026 · Application withdrawn
555 Eastern Ave · Minor variance
To alter the existing one-storey, four-unit, commercial building by converting Unit 1 (abutting Eastern Avenue and Heward Avenue) into a showroom and vehicle service shop (BMW). There will be a total of five car lifts and four motorcycle repair bays within this unit. Also, five vehicular parking spaces (including two accessible parking spaces) will be provided on-site.
120 m away · filed Aug 18, 2025 · Approved
132 Morse St · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear one-storey addition with a rooftop deck above.
210 m away · filed Oct 3, 2024 · Approved
97 Morse St · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a partial front ground floor addition (with a basement extension below), a new front porch with stairs, a rear two-storey addition (with a basement extension below), a rear first storey deck with stairs, and a rear third storey rooftop deck (on the roof of the second storey below). The existing rear basement walkout will be demolished.
220 m away · filed Apr 6, 2024 · Approved
42 Winnifred Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a second storey rear addition with a front balcony, and a third storey addition with a rear balcony, as well as to enlarge the rear deck and to enclose the front porch.
240 m away · filed May 11, 2022 · Approved
1001 Queen St E · Minor variance
To construct a six-storey mixed-use building comprising of 2 commercial units on the ground level (fronting Queen Street East) and a total of 28 residential units (1 unit on the ground level (fronting Pape Avenue), and the remaining 27 units on the second to sixth levels).
250 m away · filed May 6, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.