Toronto address · Ward 12, Toronto-St. Paul's
130 Merton St
The City of Toronto has 14 building permits since 2017 (4 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Permit issued
Heating and ventilation
HVAC - Proposed occupancy of Unit 200 & 300 with partial interior alterations to third-floor.
Applied Jun 12, 2026 · issued Jun 17, 2026 · Permit 26 183613 HVA
- Permit issued
Addition or alteration · Interior alterations
Proposed occupancy of Unit 200 & 300 with partial interior alterations to third-floor.
Applied Jun 12, 2026 · issued Jun 16, 2026 · Permit 26 183613 BLD
- Inspections under way
Addition or alteration · Garage Repair/Reconstruction
Proposal for localized parking garage repair.
Applied Jun 18, 2025 · issued Jul 9, 2025 · Permit 25 179453 BLD
- Closed
Heating and ventilation
HVAC - Interior alteration to existing office suite.
Applied Aug 8, 2023 · issued Sep 13, 2023 · completed Nov 17, 2023 · Permit 23 181645 HVA
- Closed
Addition or alteration · Interior alterations
Interior alteration to existing office suite.
Applied Jul 29, 2023 · issued Aug 10, 2023 · completed Aug 14, 2026 · Permit 23 181645 BLD
- Closed
Plumbing
Plumbing - Interior alterations to existing office suite
Applied May 26, 2023 · issued Jul 11, 2023 · completed Oct 24, 2023 · Permit 23 151283 PLB
- Closed
Addition or alteration · Interior alterations
Interior alterations to existing office suite
Applied May 26, 2023 · issued Jun 15, 2023 · completed Oct 27, 2023 · Permit 23 151283 BLD
- Closed
Heating and ventilation
HVAC - Interior alterations to existing office suite
Applied May 26, 2023 · issued Jul 11, 2023 · completed Oct 26, 2023 · Permit 23 151283 HVA
- Closed
Heating and ventilation
HVAC - Proposal for interior alterations to existing office space on the 6th floor - Sprint Senior Care
Applied May 11, 2022 · issued Jun 8, 2022 · completed Dec 2, 2022 · Permit 22 145296 HVA
- Closed
Addition or alteration · Interior alterations
Proposal for interior alterations to an existing office space on the 6th floor level - 'Sprint Senior Care'
Applied May 11, 2022 · issued May 17, 2022 · completed Dec 21, 2022 · Permit 22 145296 BLD
- Closed
Fire and security upgrade · Fire alarm
Replace existing fire alarm control panel and annunciator
Applied Dec 12, 2017 · issued Feb 1, 2018 · completed Apr 23, 2019 · Permit 17 274332 FSU
- Closed
Heating and ventilation · Alter: Boiler/Furnace/AC replacement
Existing air handling units on the roof are to be removed and replaced with new units with the same heating and cooling design capacities. New units are to hoisted into place using a crane. new units are to be connected to the existing ductwork on the roof. Existing AHU roof supports are to be replaced. Work includes electrical connection to new units, and replacement of the existing disconnect switches for the AHU'S.
Applied Nov 24, 2016 · issued Dec 21, 2016 · completed Jun 12, 2017 · Permit 16 255641 MSA
Show 2 more permits
- Closed
Plumbing · Backflow prevention devices (Water only)
To install 1 Backflow Prevention Devices (Water only).
Applied Sep 21, 2016 · issued Oct 28, 2016 · completed Oct 6, 2025 · Permit 16 226242 PSA
- Inspections under way
Addition or alteration · Interior alterations
Proposed interior alterations to ground floor washrooms. Existing space is office.
Applied Mar 22, 2012 · issued Apr 3, 2012 · Permit 12 140907 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
- Approved
37 storeys · 442 homes · Mixed use
70 m away · Site plan · Approved · filed Oct 14, 2021
- Under review
36 storeys · 400 homes · Mixed use
90 m away · Site plan · Under review · filed Mar 14, 2025
- Under review
40 storeys · 434 homes · Mixed use
200 m away · Site plan · Under review · filed Apr 28, 2022
- Under review
32 storeys · 423 homes · Residential
210 m away · Site plan · Under review · filed Jun 22, 2022
- Under appeal
46 storeys · 581 homes · Mixed use
210 m away · Rezoning · Under appeal · filed Aug 31, 2022
Neighbours’ Committee of Adjustment files within 250 m
30 Merton St · Consent
To obtain consent to sever the property into three stratified lots (commercial parking lands, retail lands, and residential lands) and to create various easements/rights-of-ways for the approved 37-storey mixed-use building with a three level below grade parking garage (currently under construction).
240 m away · filed Jul 23, 2026 · Hearing scheduled
119 Merton St · Minor variance
To alter the existing 12-storey apartment building (Building A) by enclosing the double-height opening within Unit 417 (located on the fourth and fifth levels) for additional habitable space.
70 m away · filed Sep 17, 2025 · Approved
33 Davisville Ave · Consent
To obtain consent to sever the property into two lots, to maintain existing easements/rights-of-way as well as to create new easements/rights-of-way.
240 m away · filed May 2, 2024 · Approved
111 Davisville Ave · Minor variance
To alter the existing 22-storey residential building by converting a storage locker room (on Basement Level 1) into a Market Garden use (with an aeroponic growing system), which will supply local restaurants and grocery stores.
170 m away · filed Mar 28, 2024 · Approved
155 Balliol St · Minor variance
To permit the reduction of residential parking spaces provided within the 38-storey residential building, currently under review by Site Plan Application (File Number 21 225918 STE 12 SA). There will be a total of 442 residential dwelling units within this building.
80 m away · filed Mar 22, 2023 · Approved
119 Merton St · Minor variance
To alter the mezzanine levels within two adjacent dwelling units (units 1210 and 1216).
70 m away · filed Feb 15, 2023 · Approved
68 Davisville Ave · Consent
To obtain consent to create of a new easement/right-of-way.
230 m away · filed Aug 2, 2022 · Approved
155 Balliol St · Consent
To obtain consent to sever the lot into two lots and to create new easements/rights-of-way for parking and vehicle access, as well as a dog walk area.
80 m away · filed Mar 9, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.