Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 14, Toronto-Danforth

130 Mortimer Ave

The City of Toronto has 1 building permit since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Finishing basements

    Repair concrete slab, reconstruct front porch

    Applied Jun 21, 2001 · issued Aug 15, 2001 · completed Jun 8, 2026 · Permit 01 150638 CMB

    Closed (dormant)

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 157 Westwood Ave · Minor variance

    To construct a new one-storey detached ancillary building (one-car garage), in the rear yard, abutting Carlaw Avenue. The existing detached garage will be demolished.

    140 m away · filed Jun 17, 2026 · Hearing scheduled

  • 139 Floyd Ave · Minor variance

    To permit an apartment building use by constructing a new three-storey building with front and rear basement walkouts, front and rear covered porches with stairs, front and rear balconies located on the second and third storeys. There will be a total of six residential dwelling units on this lot (two units occupying the basement level, two units occupying the first level, and two units occupying the second and third levels).

    240 m away · filed Feb 23, 2026 · Hearing scheduled

  • 139 Floyd Ave · Minor variance

    To permit an apartment building use by constructing a new three-storey building with front and rear basement walkouts, front and rear covered porches with stairs, as well as front and rear balconies located on the second and third storeys. There will be a total of six residential dwelling units on this lot (two units occupying the basement level, two units occupying the first level, and two units occupying the second and third levels).

    240 m away · filed Feb 23, 2026 · Hearing scheduled

  • 139 Floyd Ave · Consent

    To obtain consent to sever the property into three undersized residential lots.

    240 m away · filed Feb 23, 2026 · Hearing scheduled

  • 139 Floyd Ave · Minor variance

    To permit an apartment building use by constructing a new three-storey building with front and rear basement walkouts, front and rear covered porches with stairs, front and rear balconies located on the second and third storeys. There will be a total of six residential dwelling units on this lot (two units occupying the basement level, two units occupying the first level, and two units occupying the second and third levels).

    240 m away · filed Feb 23, 2026 · Hearing scheduled

  • 80 Nealon Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear two-storey addition, and a rear ground floor covered deck with a rear basement extension below.

    240 m away · filed Aug 1, 2024 · Approved

  • 78 Westwood Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition. The existing rear one-storey addition will be demolished, and the existing shed in the rear yard will be maintained and unaltered.

    150 m away · filed Jun 17, 2024 · Approved

  • 196 Fulton Ave · Minor variance

    To construct a new one-storey ancillary building (detached garage with an undersized parking space) in the rear yard of the existing two-storey semi-detached dwelling. The existing detached garage, shed, and a portion of the rear ground floor deck will be demolished.

    210 m away · filed May 30, 2024 · Approved

Everything planned in Toronto-Danforth

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.