Toronto address · Ward 19, Beaches-East York
132 King Edward Ave
The City of Toronto has 8 building permits since 2017 and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation
Revision 01 - chagnes to mechanical workHVAC - Proposed rear and second storey addition and interior alterations to existing single storey single family dwelling.
Applied Sep 18, 2020 · issued Oct 9, 2020 · completed Jun 1, 2021 · Permit 18 201778 HVA (revision 01)
- Closed
Small residential project · Multiple projects
Rev 01: Proposal to convert crawl space to mechanical/storage room, cold storage under the front porch and relocate basement washroom.Proposed rear and second storey addition and interior alterations to existing single storey single family dwelling.
Applied Jan 23, 2020 · issued Jul 23, 2020 · completed May 31, 2021 · Permit 18 201778 BLD (revision 02)
- Closed
Drains and site services
Drain - Proposed rear and second storey addition and interior alterations to existing single storey single family dwelling.
Applied Dec 17, 2019 · issued Dec 17, 2019 · completed Jun 1, 2021 · Permit 18 201778 DRN
- Closed
Drains and site services · Back water valve (Sewer only)
Proposal to install a back water valve.
Applied Oct 28, 2019 · issued Oct 28, 2019 · completed Dec 17, 2019 · Permit 19 242064 DRN
- Closed
Small residential project · Multiple projects
REVISION - to alter the elevation of the roof (change from sloped roof to flat roof)Proposed rear and second storey addition and interior alterations to existing single storey single family dwelling.
Applied Mar 18, 2019 · issued Sep 10, 2019 · completed May 31, 2021 · Permit 18 201778 BLD (revision 01)
- Closed
Small residential project · Multiple projects
Proposed rear and second storey addition and interior alterations to existing single storey single family dwelling.
Applied Jul 30, 2018 · issued Sep 20, 2018 · completed May 31, 2021 · Permit 18 201778 BLD
- Closed
Plumbing
Plumbing - Proposed rear and second storey addition and interior alterations to existing single storey single family dwelling.
Applied Jul 30, 2018 · issued Sep 20, 2018 · completed Jun 1, 2021 · Permit 18 201778 PLB
- Closed
Heating and ventilation
HVAC - Proposed rear and second storey addition and interior alterations to existing single storey single family dwelling.
Applied Jul 30, 2018 · issued Sep 20, 2018 · completed Jun 1, 2021 · Permit 18 201778 HVA
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
Decision: Withdrawn
Filed Jun 11, 2020 · File A0494/20TEY
What’s planned nearby
Development sites within 500 m
- Approved
Neighbours’ Committee of Adjustment files within 250 m
213 Gledhill Ave · Minor variance
To construct a new three-storey detached dwelling (houseplex) with front and rear basement walkouts, a covered front porch with stairs, a rear partially covered ground floor deck, front and rear second and third storey balconies, and a rear yard parking pad. There will be a total of six residential dwelling units on this lot.
240 m away · filed Feb 9, 2026 · Approved
279 Cedarvale Ave · Minor variance
To construct a new three-storey detached dwelling (houseplex) which will be cantilevered at the front second storey, with one front yard parking pad, front and rear basement walkouts, a front covered porch with stairs, a rear ground floor deck with stairs, and front and rear third storey balconies. There will be a total of six residential dwelling units on this lot.
140 m away · filed Dec 4, 2025 · Approved
127 Coleridge Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear two-storey addition. The existing rear ground floor deck will be demolished.
150 m away · filed Nov 24, 2025 · Approved
105 Gledhill Ave · Minor variance
To permit and maintain the existing interlock paving area in the front yard which will be used as a front yard parking pad.
200 m away · filed Sep 19, 2025 · Approved
169 Gledhill Ave · Minor variance
To alter the existing two-storey detached dwelling by reconstructing the existing enclosed front enclosure that was constructed without an authorized building permit, and to construct a front second storey addition (above the enclosed porch), and a front porch with stairs and a canopy. Also, to permit the rear ground floor deck with stairs that was constructed without an authorized building permit (the rear deck is obstructing access to the parking space in the rear yard).
150 m away · filed Jan 2, 2025 · Approved
279 Cedarvale Ave · Minor variance
To construct a new two-storey detached dwelling with a covered front porch, a rear ground floor covered balcony, front and rear basement patios, front and rear second floor balconies, and a front yard parking pad. This dwelling will have a total of three residential dwelling units (triplex).
140 m away · filed Jan 23, 2024 · Approved
191 Gledhill Ave · Minor variance
To construct a new three-storey detached dwelling (fourplex) by constructing a front porch, a front and rear basement walkout, a rear first storey covered deck, a rear second floor balcony, and front and rear third floor decks (on the roof of the second storey below). Also, to construct a rear two-storey detached ancillary building (garden suite). There will be a total of five dwelling units on this lot.
180 m away · filed Oct 27, 2023 · Approved
101 King Edward Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear two storey addition, a rear ground floor deck with stairs, a rear basement walkout and a roof top deck with an access stair enclosure. Also, to enclose the existing front porch.
50 m away · filed Oct 18, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.