Toronto address · Ward 21, Scarborough Centre
1343 Warden Ave
The City of Toronto has 5 building permits since 2017 and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Drains and site services · Inside and outside drains
To increase domestic water piping from 1/2 inch to 1 inch to existing dwelling
Applied Dec 2, 2019 · issued Dec 2, 2019 · completed Sep 23, 2020 · Permit 19 256249 STS
- Closed
Heating and ventilation
Rev 01 - minor changes to the existing mechanical drawings. HVAC - Rear ground and second floor addition with interior alterations and two rear decks for a two unit residential
Applied Jul 23, 2019 · issued Jul 26, 2019 · completed Sep 23, 2020 · Permit 18 178945 HVA (revision 01)
- Closed
Heating and ventilation
HVAC - Rear ground and second floor addition with interior alterations and two rear decks for a two unit residential
Applied Jun 15, 2018 · issued Aug 3, 2018 · completed Sep 23, 2020 · Permit 18 178945 HVA
- Closed
Plumbing
Plumbing - Rear ground and second floor addition with interior alterations and two rear decks for a two unit residential
Applied Jun 15, 2018 · issued Aug 3, 2018 · completed Sep 8, 2020 · Permit 18 178945 PLB
- Closed
Small residential project · Multiple projects
Rear ground and second floor addition with interior alterations and two rear decks for a two unit residential
Applied Jun 15, 2018 · issued Aug 3, 2018 · completed Oct 5, 2020 · 1 home added · Permit 18 178945 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
The applicant is seeking relief from the provisions of the Zoning By-law to construct a new two storey rear addition and a second storey to the existing dwelling.
Decision: Approved (hearing Sep 7, 2017)
Filed Jun 9, 2017 · File A0206/17SC
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
148 Lilian Dr · Minor variance
To alter the existing one-storey dwelling by constructing a one-storey addition to the rear of the existing one-storey dwelling and to permit a parking space in the front yard.
230 m away · filed Aug 25, 2025 · Approved
182 Tower Dr · Minor variance
To construct a new two-storey detached building (triplex) with a front porch, front second storey balcony, side (east) basement walkout, rear ground floor deck and rear second storey balcony. Also, to construct a two-storey ancillary building containing a garden suite (garage on the ground floor and dwelling unit above) with vehicular access from Pickwick Road in the rear yard. The existing one-storey detached dwelling and detached garage will be demolished. There will be a total of four dwelling units on the lot.
240 m away · filed Apr 9, 2025 · Approved
192 Tower Dr · Minor variance
To construct a new side yard carport to the existing dwelling.
190 m away · filed Nov 20, 2024 · Approved
198 Tower Dr · Minor variance
To alter the existing one-storey detached dwelling by constructing a second storey addition, a rear two-storey addition and interior alterations. There will be a total of four dwelling units on the property. This application was previously deferred at the April 9, 2025 hearing.
150 m away · filed Nov 4, 2024 · Approved
2 Willowhurst Cres · Minor variance
To construct a new two-storey detached dwelling with three residential units, an integral garage with vehicular access from Willowhurst Crescent, a side (north) porch, a rear basement walkout, a rear ground floor deck and a rear second storey balcony. The existing one-storey detached dwelling and shed will be demolished. NOTE: This item was previously rescheduled from the Committee of Adjustment hearing on December 4, 2024 hearing and deferred at the Committee of Adjustment hearing on January 16, 2025.
110 m away · filed Oct 25, 2024 · Approved
252 Tower Dr · Minor variance
120 m away · filed Mar 8, 2024 · Deferred
18 Willowhurst Cres · Minor variance
To permit the construction of a new 2-storey detached dwelling and integral garage.
220 m away · filed Aug 26, 2021 · Approved
12 Ilfracombe Cres · Minor variance
To permit the construction of a front and rear porch roof cover, a rear frame garage and front concrete stairs.
170 m away · filed Dec 15, 2020 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.