Toronto address · Ward 19, Beaches-East York
1349 Woodbine Ave
The City of Toronto has 2 building permits since 2017 (2 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Issuance pending
Heating and ventilation
HVAC - Interior alterations to convert laundromat to cafe
Applied Oct 6, 2022 · Permit 22 213971 HVA
- Examiner's notice sent
Addition or alteration · Interior alterations
Interior alterations to convert laundromat to cafe
Applied Oct 6, 2022 · Permit 22 213971 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
244 Virginia Ave · Minor variance
To construct a new three-storey detached residential building (containing six residential dwelling units), with three partially covered front porches with stairs (entrances to units 1, 3, and 5), three partially covered rear decks with stairs (for units 1, 3, and 5), two rear second floor bay windows (for units 3 and 5), three third floor front rooftop decks (above the second floor, for units 1, 3, and 5), and three rear basement walkouts (for units 2, 4, and 6). Also, to construct a new front (east) driveway with two parking spaces (accessed from Virginia Avenue). The existing front driveway…
230 m away · filed Oct 28, 2025 · Approved
7 Trenton Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by extending the rear second floor balcony. Also, to construct a new one-storey detached ancillary building (one-car garage) in the rear yard.
220 m away · filed Aug 20, 2025 · Approved
301 Woodmount Ave · Minor variance
To alter the existing three-storey detached dwelling by constructing a rear two-storey addition with a ground floor deck and stairs.
210 m away · filed Jun 4, 2025 · Approved
1374 Woodbine Ave · Minor variance
To construct a new three-storey detached dwelling with four residential dwelling units (fourplex). There will be front and rear ground level porches, front and rear balconies on the second and third levels, and three surface parking spaces in the rear yard.
110 m away · filed Dec 10, 2024 · Approved
323 Woodmount Ave · Minor variance
To construct a new two-storey detached dwelling with an integral two-car garage, a front porch, a front second storey balcony, a rear ground floor deck, and a rear basement walkout.
240 m away · filed Sep 3, 2024 · Approved
5 Rednor Rd · Minor variance
To alter the existing one-and-one-half-storey detached dwelling by constructing front and rear second storey additions. The two existing residential dwelling units will be maintained (one unit within the basement and one unit occupying both first and second levels).
120 m away · filed Aug 16, 2024 · Approved
24 Rednor Rd · Minor variance
To construct a new two-storey detached dwelling with a front integral garage, a front covered porch, a rear ground level deck, rear basement walkout stairs and an entry-way, and a rear second storey balcony. The existing rear yard wood deck, detached shed, and detached garage will be demolished.
200 m away · filed Apr 12, 2024 · Approved
35 Rednor Rd · Minor variance
To construct a new two-storey detached dwelling with a rear enclosed deck. Also, to construct a new detached ancillary structure (two car garage) with vehicular access from Plains Road. The existing one-storey detached dwelling will be demolished.
210 m away · filed Oct 13, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.