Toronto address · Ward 14, Toronto-Danforth
135 Gough Ave
The City of Toronto has 4 building permits since 2017 (4 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Revision issued
Small residential project · Multiple projects
Rev#1 - Revision to cladding, third floor layout, south facade windows and new shed in rear yard To construct ground and 3rd floor addition (26m2), interior alteration (169.2m2) finished basement (65.4m2) underpinning (34lm) and covered porch
Applied Jan 20, 2016 · issued Feb 1, 2016 · Permit 15 105391 BLD (revision 01)
- Inspections under way
Heating and ventilation
HVAC - To construct ground and 3rd floor addition (26m2), inteiror alteration (169.2m2) finished basement (65.4m2) underpinning (34lm) and covered porch
Applied Mar 28, 2015 · issued Jun 4, 2015 · Permit 15 105391 HVA
- Inspections under way
Small residential project · Multiple projects
To construct ground and 3rd floor addition (26m2), inteiror alteration (169.2m2) finished basement (65.4m2) underpinning (34lm) and covered porch
Applied Jan 16, 2015 · issued Jan 20, 2015 · Permit 15 105391 BLD
- Inspections under way
Plumbing
Plumbing - To construct ground and 3rd floor addition (26m2), inteiror alteration (169.2m2) finished basement (65.4m2) underpinning (34lm) and covered porch
Applied Jan 16, 2015 · issued Jan 20, 2015 · Permit 15 105391 PLB
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
49 storeys · 496 homes · Mixed use
250 m away · Site plan · Under review · filed Aug 3, 2022
Neighbours’ Committee of Adjustment files within 250 m
108 Eaton Ave · Minor variance
Proposal to construct a ground floor 1-storey rear addition & a ground floor rear yard deck for this existing detached SFD. Scope includes the demolition of the exist. rear addition & the exist. rear yard deck.
250 m away · filed Jun 2, 2026 · Accepted
49 Muriel Ave · Minor variance
To construct a new front yard parking pad, abutting Muriel Avenue.
190 m away · filed Oct 10, 2025 · Refused
111 Gough Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear two-storey addition (with basement below), a third storey addition, a side (south) basement walkout, a rear ground floor covered deck with stairs, and front and rear third storey balconies There will be a total of two dwelling units on the lot (one secondary suite in the basement).
70 m away · filed Jul 25, 2025 · Deferred
13 Cruikshank Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing an east side three-storey addition, a front covered porch, and a rear deck with stairs. Also, to permit a front yard parking pad and to construct a rear one-storey ancillary building (shed). The existing rear one-storey ancillary building (three-car garage) will be demolished.
80 m away · filed Mar 10, 2025 · Approved
878 Carlaw Ave · Consent
Section 57(1) of the Planning Act allows the assignment of authority to the Secretary-Treasurer, Committee of Adjustment or his/her designate to approve a Validation of Title.
150 m away · filed Jun 12, 2024 · Approved
889 Carlaw Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a complete third storey addition with a rear balcony.
160 m away · filed Dec 13, 2023 · Approved
143 Gough Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a complete third storey addition with a front juliet balcony, and a rooftop patio.
30 m away · filed Sep 11, 2023 · Approved
72 Eaton Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a rear two-storey cantilevered addition, a complete third storey addition with a rear balcony, a front covered porch, a rear ground floor deck, and a basement secondary suite with a front basement walkout. Also, to construct a one-storey ancillary structure (shed) in the rear yard.
210 m away · filed Jul 5, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.