Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 13, Toronto Centre

135 Seaton St

The City of Toronto has 1 building permit since 2017 (1 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing · Other

    Proposal to install one back water valve to sanitary line. Proposal includes replacement of sanitary and domestic water service.

    Applied Apr 5, 2011 · issued Apr 7, 2011 · Permit 11 165946 PSA

    Inspections under way

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Consent · Create new Easement/ROW

    To obtain consent for the creation of a new easement.

    Decision: Approved (hearing Sep 24, 2015)

    Filed Jul 29, 2015 · File B0061/15TEY

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 320 Ontario St · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear two-storey addition with a ground floor covered deck. The existing rear one-storey addition and rear deck will be demolished.

    210 m away · filed Apr 10, 2025 · Approved

  • 401 Dundas St E · Minor variance

    To alter the development standards (as approved under Site Specific Zoning By-law 770-2023), for a new 14-storey mixed-use building, by increasing the gross floor area, and building height.

    150 m away · filed Apr 18, 2024 · Approved

  • 394 Dundas St E · Minor variance

    To permit the existing two-storey rowhouse into a rooming house (a total of 5 suites) through interior alterations. Also, to maintain the existing rear one-storey ancillary building (detached garage), in the rear yard, abutting the laneway.

    170 m away · filed Aug 14, 2023 · Approved

  • 272 Berkeley St · Minor variance

    To permit three secondary suites (one within the basement, one on the second level, and one on the third level) in the existing semi-detached dwelling, which were constructed without an authorized building permit. Also, to permit a rear outdoor staircase, as well as a rear landing with stairs at the ground floor level. The existing rear deck and balconies will be demolished.

    210 m away · filed Jun 9, 2023 · Approved

  • 238 Berkeley St · Minor variance

    To construct a four-storey townhouse dwelling with a front integral garage, a front fourth floor balcony, a rear second floor deck, and rear Juliet balconies on the third and fourth floors.

    150 m away · filed Mar 10, 2023 · Approved

  • 238 Berkeley St · Minor variance

    To construct a four-storey townhouse dwelling with a front integral garage, a front fourth floor balcony, a rear second floor deck, and rear Juliet balconies on the third and fourth floors.

    150 m away · filed Mar 10, 2023 · Approved

  • 238 Berkeley St · Consent

    To obtain consent to sever the lot into six residential lots and to create a new easements/rights-of-way for servicing purposes.

    150 m away · filed Mar 10, 2023 · Approved

  • 238 Berkeley St · Minor variance

    To construct a four-storey townhouse dwelling with a front integral garage, a front fourth floor balcony, a rear second floor deck, and rear Juliet balconies on the third and fourth floors.

    150 m away · filed Mar 10, 2023 · Approved

Everything planned in Toronto Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.