Toronto address · Ward 5, York South-Weston
138 John St
The City of Toronto has 5 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Pool fence enclosure
Proposed new Pool Fence Enclosure
Applied Jun 21, 2019 · issued Jun 28, 2019 · completed Jun 28, 2019 · Permit 19 176001 BLD
- Closed
Small residential project · Multiple projects
Revision - M BR access tairs and rebuild garage - Proposal to construct two storey rear addition, second floor addition over existing attached garage, rear deck, front porch and interior alteration to existing single family detached dwelling. See also 15 129541 ZZC and 15 146561 MV.
Applied Feb 19, 2016 · issued Mar 24, 2016 · completed Feb 3, 2021 · Permit 15 210365 BLD (revision 01)
- Closed
Heating and ventilation
HVAC - Proposal to construct two storey rear addition, second floor addition over existing attached garage, rear deck, front porch and interior alteration to existing single family detached dwelling. See also 15 129541 ZZC and 15 146561 MV.
Applied Aug 20, 2015 · issued Sep 15, 2015 · completed Feb 1, 2021 · Permit 15 210365 HVA
- Closed
Plumbing
Plumbing - Proposal to construct two storey rear addition, second floor addition over existing attached garage, rear deck, front porch and interior alteration to existing single family detached dwelling. See also 15 129541 ZZC and 15 146561 MV.
Applied Aug 20, 2015 · issued Sep 15, 2015 · completed Feb 1, 2021 · Permit 15 210365 PLB
- Closed
Small residential project · Multiple projects
Proposal to construct two storey rear addition, second floor addition over existing attached garage, rear deck, front porch and interior alteration to existing single family detached dwelling. See also 15 129541 ZZC and 15 146561 MV.
Applied Aug 20, 2015 · issued Sep 15, 2015 · completed Feb 3, 2021 · Permit 15 210365 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
53 storeys · 463 homes · Mixed use
250 m away · Site plan · Under review · filed Sep 21, 2021
Neighbours’ Committee of Adjustment files within 250 m
29 William St · Minor variance
To construct a two storey rear addition, a second storey addition above the existing dwelling, and an attached garage along the west side of the dwelling.
210 m away · filed Feb 28, 2025 · Deferred
105 John St · Minor variance
To construct a two-storey rear addition and to enclose an existing front porch.
130 m away · filed Sep 6, 2023 · Approved
46 William St · Minor variance
To construct a second storey addition above the existing dwelling, a two-storey rear addition and a new two-storey ancillary building in the rear yard which contains a garage located on the first storey and a garden suite located on the second storey.
160 m away · filed May 3, 2023 · Approved
127 King St · Minor variance
To legalize and to maintain the partially built detached garage in the rear yard.
180 m away · filed Mar 6, 2023 · Approved
92 John St · Minor variance
To construct a second storey addition, a side entry at west elevation and a front balcony.
180 m away · filed Jan 25, 2023 · Approved
45 William St · Minor variance
To construct a garden suite in the rear yard.
190 m away · filed Jan 13, 2023 · Refused
25 William St · Minor variance
To construct a new detached dwelling with an attached garage. A previous Committee of Adjustment application (A0406/20EYK) approved variances related to floor space index and side yard setback.
230 m away · filed Dec 19, 2022 · Approved
119 King St · Minor variance
To construct a one-storey addition above the existing dwelling and a two-storey rear addition and a new rear yard detached garage.
210 m away · filed Jun 27, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.