Toronto address · Ward 18, Willowdale
138 Olive Ave
The City of Toronto has 5 building permits since 2017 (5 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Heating and ventilation
HVAC - Proposed new detached SFD
Applied Oct 22, 2024 · issued Nov 21, 2024 · Permit 24 195603 HVA
- Inspections under way
New house · New building
Proposed new detached SFD
Applied Aug 9, 2024 · issued Sep 24, 2024 · 1 home added · Permit 24 195603 BLD
- Inspections under way
Demolition
Proposed demolition of the existing dwelling (NH application: 24 195603 BLD)
Applied Aug 9, 2024 · issued Sep 24, 2024 · 1 home removed · Permit 24 195653 DEM
- Inspections under way
Plumbing
Plumbing - Proposed new detached SFD
Applied Aug 9, 2024 · issued Sep 24, 2024 · Permit 24 195603 PLB
- Inspections under way
Drains and site services
Drain - Proposed new detached SFD
Applied Aug 9, 2024 · issued Sep 24, 2024 · Permit 24 195603 DRN
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · New R building
Proposal to construct a new detached dwelling.
Decision: Approved (hearing Apr 11, 2024)
Filed Feb 15, 2024 · File A0082/24NY
What’s planned nearby
Development sites within 500 m
- Under review
11 storeys · Mixed use
200 m away · Site plan · Under review · filed Jul 31, 2026
- Approved
7 storeys · 40 homes · Residential
280 m away · Rezoning · Approved · filed May 28, 2025
- Under review
4 storeys · Residential
280 m away · Site plan · Under review · filed Apr 26, 2022
Neighbours’ Committee of Adjustment files within 250 m
104 Finch Ave E · Minor variance
To alter the development standards, as approved under Site-Specific Zoning By-law 256-2025, for the proposed 14-storey mixed use building, including to increase the gross floor area and, building height, and modifications to the setbacks, amenity space and bicycle parking requirements.
200 m away · filed Jul 13, 2026 · Approved
134 Pemberton Ave · Consent
To obtain consent to sever the property into two residential lots. NOTE: Applications B0033/24NY, A0399/24NY and A0400/24NY will be considered jointly.
220 m away · filed Jul 8, 2024 · Deferred
134 Pemberton Ave · Minor variance
To construct a new two-storey detached dwelling with an integral garage and a secondary suite in the basement. Also proposed is a front porch, rear deck and basement walkout. NOTE: Applications B0033/24NY, A0399/24NY and A0400/24NY will be considered jointly.
220 m away · filed Jul 8, 2024 · Deferred
134 Pemberton Ave · Minor variance
To construct a new two-storey detached dwelling with an integral garage and a secondary suite in the basement. Also proposed is a front porch, rear deck and basement walkout. NOTE: Applications B0033/24NY, A0399/24NY and A0400/24NY will be considered jointly.
220 m away · filed Jul 8, 2024 · Deferred
152 Holmes Ave · Minor variance
To legalize and maintain the enclosed front porch. Please note, the file was deferred April 11, 2024, in order to provide the applicant an opportunity to consult with Community Planning staff and the Ward Councillor.
160 m away · filed Feb 15, 2024 · Approved
143 Olive Ave · Minor variance
Proposal to build a new detached dwelling
50 m away · filed Sep 25, 2023 · Approved
140 Olive Ave · Minor variance
To construct a new dwelling.
20 m away · filed Dec 14, 2021 · Approved
111 Pemberton Ave · Consent
To obtain consent to sever the land for the purpose of creating two (2) undersized parcels. Please note, this file was deferred on April 14th, 2022 in order to meet with City Planning.
230 m away · filed Dec 1, 2021 · Deferred
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.