Toronto address · Ward 4, Parkdale-High Park
138 Sorauren Ave
The City of Toronto has 1 building permit since 2017 (1 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Addition or alteration · Other
Build fire escape to grade from second storey roof(access to deck) See WES Permit(copy) ''PARKDALE'' J.Bitaxi familiar
Applied Oct 15, 2002 · issued Dec 3, 2002 · Permit 02 181098 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
125 Sorauren Ave · Minor variance
To alter the existing three-storey detached dwelling (configured as a triplex and currently used as a one-unit dwelling) by constructing a front third-floor addition and a rear addition, with a rear ground floor patio and a rear second storey deck. The existing rear exterior staircase will be demolished. There will be a total of one residential dwelling unit on the lot.
50 m away · filed Feb 13, 2026 · Approved
19 Galley Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a front covered porch extension, a rear two-storey addition with a partially covered ground floor deck, and a third storey addition. Also, to construct a new one-storey ancillary building (detached garage) in the rear yard, abutting the laneway.
180 m away · filed Nov 10, 2025 · Approved
45 Fern Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear one-storey addition, a rear ground floor deck with stairs, and one residential dwelling unit within the basement. Also, to construct a new one-storey ancillary structure (storage shed) in the rear yard. There will be a total of two residential dwelling units on this lot (one unit within the basement level, and one unit occupying the first, second, and third levels).
210 m away · filed Sep 23, 2025 · Approved
93 Pearson Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey dormer addition, ground floor addition and basement addition. Also, to construct a new rear ground floor deck with stairs.
170 m away · filed May 7, 2025 · Approved
21 Galley Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a rear third floor addition, and rear ground floor deck with stairs. The existing rear one-storey addition with stairs will be demolished.
170 m away · filed May 6, 2025 · Approved
73 Sorauren Ave · Minor variance
To alter the existing three-storey detached dwelling (Fife House Foundation) by constructing two third storey dormers on the south side. Also, to construct a south side exterior platforms/staircase to access the second and third levels.
170 m away · filed Apr 28, 2025 · Approved
145 Sorauren Ave · Minor variance
To alter the existing two-storey semi-detached dwelling (containing two residential dwelling units) by constructing a rear one-storey addition with a ground floor paved walkway (at the northeast portion of the dwelling). The existing rear deck will be demolished.
50 m away · filed Sep 11, 2024 · Approved
127 Garden Ave · Minor variance
To alter the existing two-storey townhouse dwelling by constructing a rear one-storey addition. A portion of the existing rear ground floor deck will be demolished.
230 m away · filed Jun 30, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.