Toronto address · Ward 16, Don Valley East
14 Addison Cres
The City of Toronto has 6 building permits since 2017 (5 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Revision issued
Heating and ventilation
Revision 01: change to 2 furnace system for whole house. HVAC - Proposal to demolish existing dwelling to construct new two storey Single Family Dwelling with finished walkout basement, integral garage and rear deck
Applied Oct 3, 2025 · issued Nov 12, 2025 · Permit 23 126445 HVA (revision 01)
- Inspections under way
Heating and ventilation
HVAC - Proposal to demolish existing dwelling to construct new two storey Single Family Dwelling with finished walkout basement, integral garage and rear deck
Applied Apr 1, 2025 · issued Apr 14, 2025 · Permit 23 126445 HVA
- Inspections under way
New house · New building
Proposal to demolish existing dwelling to construct new two storey Single Family Dwelling with finished walkout basement, integral garage and rear deck
Applied Mar 24, 2023 · issued Nov 10, 2023 · 1 home added · Permit 23 126445 BLD
- Inspections under way
Plumbing
Plumbing - Proposal to demolish existing dwelling to construct new two storey Single Family Dwelling with finished walkout basement, integral garage and rear deck
Applied Mar 24, 2023 · issued Nov 10, 2023 · Permit 23 126445 PLB
- Inspections under way
Drains and site services
Drain - Proposal to demolish existing dwelling to construct new two storey Single Family Dwelling with finished walkout basement, integral garage and rear deck
Applied Mar 24, 2023 · issued Nov 10, 2023 · Permit 23 126445 DRN
- Closed
Demolition
Proposal to demolish existing dwelling to construct new two storey Single Family Dwelling with finished walkout basement, integral garage and rear deck
Applied Mar 24, 2023 · issued Nov 10, 2023 · completed Sep 17, 2025 · 1 home removed · Permit 23 126446 DEM
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · New R building
To construct a new two-storey single family dwelling with an integral garage and a finished basement.
Decision: Approved (hearing Jun 23, 2022)
Filed Apr 7, 2022 · File A0241/22NY
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
12 Fordham Pl · Minor variance
To construct a new two-storey detached dwelling.
90 m away · filed Aug 1, 2025 · Approved
49 Addison Cres · Minor variance
To construct a new two-storey duplex with an integral garage.
140 m away · filed Jun 9, 2025 · Approved
49 Addison Cres · Minor variance
To construct a new 2-story duplex dwelling with integrated garage.
140 m away · filed Apr 14, 2025 · Refused
48 Bradgate Rd · Minor variance
To add a second floor to the frame structure in the rear yard to accommodate a garden suite.
240 m away · filed Mar 13, 2025 · Approved
44 Berkinshaw Cres · Minor variance
To alter the existing one-storey detached dwelling by constructing a new second floor addition, two-storey rear addition, new rear deck and covered front porch.
240 m away · filed Dec 10, 2024 · Approved
12 Fordham Pl · Minor variance
Proposal to construct a new second floor addition, new porch, new garage addition and reconstruction of roof over existing single family detached dwelling.
90 m away · filed Jun 3, 2024 · Approved
35 Bradgate Rd · Minor variance
To enclose the existing carport in conjunction with other interior and exterior alterations.
180 m away · filed Jul 19, 2023 · Approved
23 Addison Cres · Minor variance
To construct a new dwelling in conjunction with a new ancillary structure (garden suite). Please note this application was previously deferred June 9, 2023 in order to allow the applicant an opportunity to meet with the Planning Department and make revisions.
80 m away · filed Apr 24, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.