Toronto address · Ward 19, Beaches-East York
14 Balsam Ave
The City of Toronto has 10 building permits since 2017 (3 still open) and 3 Committee of Adjustment files on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
New house · New building
Revision 01 - Interior alterations to basement, second and third floorsTo demolish existing dwelling and construct a new three storey dwelling - Part 1
Applied May 26, 2023 · issued Jul 12, 2023 · completed Apr 26, 2024 · Permit 21 247577 BLD (revision 01)
- Closed
Heating and ventilation
HVAC - To demolish existing dwelling and construct a new three storey dwelling - Part 1
Applied Sep 9, 2022 · issued Sep 27, 2022 · completed Apr 26, 2024 · Permit 21 247577 HVA
- Inspections under way
Heating and ventilation
HVAC - To demolish existing dwelling and construct a new three storey dwelling - Part 2
Applied Aug 11, 2022 · issued Aug 25, 2022 · Permit 21 247582 HVA
- Closed
New house · New building
To demolish existing dwelling and construct a new three storey dwelling - Part 1
Applied Dec 12, 2021 · issued Mar 9, 2022 · completed Apr 26, 2024 · 1 home added · Permit 21 247577 BLD
- Closed
Demolition
To demolish existing dwelling and construct a new three storey dwelling
Applied Dec 12, 2021 · issued Mar 10, 2022 · completed Oct 16, 2024 · 1 home removed · Permit 21 247580 DEM
- Closed
Drains and site services
Drain - To demolish existing dwelling and construct a new three storey dwelling - Part 1
Applied Dec 12, 2021 · issued Mar 8, 2022 · completed Apr 26, 2024 · Permit 21 247577 DRN
- Inspections under way
New house · New building
To demolish existing dwelling and construct a new three storey dwelling - Part 2
Applied Dec 12, 2021 · issued Mar 8, 2022 · 1 home added · Permit 21 247582 BLD
- Closed
Drains and site services
Drain - To demolish existing dwelling and construct a new three storey dwelling - Part 2
Applied Dec 12, 2021 · issued Mar 8, 2022 · completed Apr 26, 2024 · Permit 21 247582 DRN
- Inspections under way
Plumbing
Plumbing - To demolish existing dwelling and construct a new three storey dwelling - Part 2
Applied Dec 12, 2021 · issued Mar 8, 2022 · Permit 21 247582 PLB
- Closed
Plumbing
Plumbing - To demolish existing dwelling and construct a new three storey dwelling - Part 1
Applied Dec 12, 2021 · issued Mar 8, 2022 · completed Apr 26, 2024 · Permit 21 247577 PLB
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · New R building
To construct a three-storey detached house with a front porch and a rear first floor deck. A parking space will also be created in the front yard.
Decision: Approved (hearing May 26, 2021)
Filed Feb 24, 2020 · File A0222/20TEY
- Closed
Consent · Sever lot
To obtain consent to sever the property into two residential lots and to create two easements/rights-of-way.
Decision: Approved (hearing May 26, 2021)
Filed Feb 24, 2020 · 1 new lot · File B0019/20TEY
- Closed
Minor variance · New R building
To construct a three-storey detached house with a front porch and a rear first floor deck.
Decision: Approved (hearing May 26, 2021)
Filed Feb 24, 2020 · File A0221/20TEY
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
25 Selwood Ave · Minor variance
To construct a new one-storey detached ancillary building (one-car garage), in the rear yard.
110 m away · filed Sep 1, 2026 · Postponed
26 Hazel Ave · Consent
To obtain consent to create a new easement/right-of-way.
240 m away · filed Feb 19, 2026 · Approved
52 Balsam Ave · Minor variance
To maintain the existing two-storey semi-detached dwelling (duplex). There is a total of two residential dwelling units on this lot.
240 m away · filed Feb 3, 2026 · Postponed
52 Balsam Ave · Consent
To obtain consent to sever the property into two residential lots.
240 m away · filed Feb 3, 2026 · Postponed
52 Balsam Ave · Minor variance
To maintain the existing two-storey semi-detached dwelling (duplex). There is a total of two residential dwelling units on this lot.
240 m away · filed Feb 3, 2026 · Postponed
34 Balsam Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear second storey addition (above a portion of the existing rear ground floor) with a new roof (for the remaining portion of the existing rear ground floor), and a new rear ground floor deck with stairs. The existing rear ground floor deck will be demolished.
100 m away · filed Aug 25, 2025 · Approved
29 Maclean Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a partial front third storey addition (for habitable space).
40 m away · filed Jul 30, 2025 · Approved
32 Fernwood Park Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a partial third storey addition, a rear first level deck, and rear and side (south) basement walkouts. The front porch will be reconstructed with a canopy and stairs. One parking space will be located in the rear yard, which will be accessed from a shared mutual right-of-way between 30 and 32 Fernwood Park Avenue. There will be a total of two residential dwelling units (duplex) on this lot (one unit within the basement level, and one unit to occupy the first, second, and third levels).
120 m away · filed Jul 28, 2025 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.