Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 24, Scarborough-Guildwood

14 Bethune Blvd

The City of Toronto has 5 building permits since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Multiple projects

    Revision 02. Revision to basement areaa Conversion of unexcavated area to crawl space Removal of Non Load bearing walls in Basement.To construct front and second storey addition, new porch, rear walkout and interior alterations to existing building

    Applied Apr 27, 2020 · issued May 28, 2020 · completed May 25, 2021 · Permit 19 193722 BLD (revision 02)

    Closed
  • Small residential project · Multiple projects

    Revision 01. Revision to roof designTo construct front and second storey addition, new porch, rear walkout and interior alterations to existing building

    Applied Jan 21, 2020 · issued Feb 5, 2020 · completed May 25, 2021 · Permit 19 193722 BLD (revision 01)

    Closed
  • Heating and ventilation

    HVAC - To construct front and second storey addition, new porch, rear walkout and interior alterations to existing building

    Applied Jul 23, 2019 · issued Oct 22, 2019 · completed Feb 4, 2021 · Permit 19 193722 HVA

    Closed
  • Plumbing

    Plumbing - To construct front and second storey addition, new porch, rear walkout and interior alterations to existing building

    Applied Jul 23, 2019 · issued Oct 22, 2019 · completed Feb 4, 2021 · Permit 19 193722 PLB

    Closed
  • Small residential project · Multiple projects

    To construct front and second storey addition, new porch, rear walkout and interior alterations to existing building

    Applied Jul 23, 2019 · issued Oct 22, 2019 · completed May 25, 2021 · Permit 19 193722 BLD

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    The applicant is seeking relief from the provisions of the Zoning By-law to construct a new two storey front addition with a second storey over the existing detached residential dwelling.

    Decision: Approved (hearing Jun 6, 2019)

    Filed Apr 4, 2019 · File A0094/19SC

    Closed

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 33 Catalina Dr · Minor variance

    To construct a new front and rear addition and a new second storey addition over the existing dwelling.

    50 m away · filed Aug 9, 2020 · Approved

  • 127 Sylvan Ave · Minor variance

    To construct a new two-storey single family house.

    240 m away · filed Mar 28, 2018 · Deferred

Everything planned in Scarborough-Guildwood

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.