Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 2, Etobicoke Centre

14 Matane Crt

The City of Toronto has 3 building permits since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - Construct 2nd floor addition, interior alterations, new porch, and new balcony for existing single family detached dwelling.

    Applied Apr 10, 2019 · issued May 22, 2019 · completed Apr 8, 2021 · Permit 19 138572 HVA

    Closed
  • Plumbing

    Plumbing - Construct 2nd floor addition, interior alterations, new porch, and new balcony for existing single family detached dwelling.

    Applied Apr 10, 2019 · issued May 22, 2019 · completed Apr 8, 2021 · Permit 19 138572 PLB

    Closed
  • Small residential project · Multiple projects

    Construct 2nd floor addition, interior alterations, new porch, and new balcony for existing single family detached dwelling.

    Applied Apr 10, 2019 · issued May 22, 2019 · completed Apr 26, 2021 · Permit 19 138572 BLD

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To construct a second storey addition with a second storey front platform.

    Decision: Approved (hearing Feb 21, 2019)

    Filed Dec 4, 2018 · File A0884/18EYK

    Closed

What’s planned nearby

Development sites within 500 m

  • 45 La Rose Avenue

    8 storeys · 211 homes · Residential

    480 m away · Site plan · Under appeal · filed Feb 24, 2021

    Under appeal

Neighbours’ Committee of Adjustment files within 250 m

  • 12 Matane Crt · Minor variance

    To construct a one-storey front addition to the existing attached garage.

    20 m away · filed Oct 2, 2025 · Approved

  • 141 Renault Cres · Minor variance

    To construct a second storey addition above the existing dwelling, a two-storey west side addition, an attached garage at the front and a new covered deck in the rear yard. This will be considered a new dwelling.

    210 m away · filed May 20, 2025 · Approved

  • 26 Matane Crt · Minor variance

    To construct a second storey addition over the existing dwelling, a two-storey rear addition, a new rear deck and a second storey addition over the existing front porch.

    60 m away · filed Oct 31, 2022 · Approved

  • 15 Matane Crt · Minor variance

    To construct a one-storey rear addition.

    90 m away · filed Aug 24, 2022 · Approved

  • 14 Fabian Pl · Minor variance

    To construct a two-storey rear addition, a two-storey south side addition which will include an attached garage, a second storey addition above the existing dwelling, a new rear deck, a new covered front porch and second storey rear platform.

    220 m away · filed Feb 18, 2022 · Approved

  • 38 Ridgemount Rd · Minor variance

    To construct a east side covered deck.

    220 m away · filed Oct 17, 2021 · Approved

  • 1 Ridgemount Rd · Minor variance

    To construct a new detached dwelling with an attached garage.

    90 m away · filed Apr 4, 2019 · Approved

Everything planned in Etobicoke Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.