Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 2, Etobicoke Centre

14 Ravenscrest Dr

The City of Toronto has 3 building permits since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - Proposal for a 1 storey front addition, a new 2nd floor addition, and interior alterations to an existing SFD-detached dwelling. See also 21 231026 ZZC and 22 221738 MV.

    Applied Feb 14, 2023 · issued Apr 21, 2023 · completed Jun 20, 2024 · Permit 23 113736 HVA

    Closed
  • Plumbing

    Plumbing - Proposal for a 1 storey front addition, a new 2nd floor addition, and interior alterations to an existing SFD-detached dwelling. See also 21 231026 ZZC and 22 221738 MV.

    Applied Feb 14, 2023 · issued Apr 21, 2023 · completed Jun 20, 2024 · Permit 23 113736 PLB

    Closed
  • Small residential project · Multiple projects

    Proposal for a 1 storey front addition, a new 2nd floor addition, and interior alterations to an existing SFD-detached dwelling. See also 21 231026 ZZC and 22 221738 MV.

    Applied Feb 14, 2023 · issued Apr 21, 2023 · completed Jul 25, 2024 · Permit 23 113736 BLD

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To construct a second storey addition above the existing dwelling and a new two-storey front addition.

    Decision: Approved (hearing Dec 8, 2022)

    Filed Oct 25, 2022 · File A0526/22EYK

    Closed

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 8 Glen Agar Dr · Minor variance

    To construct a new attached garage on the north side of the existing dwelling.

    190 m away · filed Mar 10, 2026 · Approved

  • 26 Ravenscrest Dr · Minor variance

    To construct a new detached dwelling with an attached garage.

    90 m away · filed Jul 18, 2025 · Approved

  • 24 Ravenscrest Dr · Minor variance

    To construct a second storey addition above the existing dwelling, and a new two-storey front addition.

    70 m away · filed Apr 15, 2024 · Approved

  • 44 Beaverbrook Ave · Minor variance

    To construct a two-storey west side addition which will include an addition to the existing garage, a second storey addition above the existing dwelling and a new rear covered deck.

    250 m away · filed Apr 25, 2022 · Approved

  • 25 Hampshire Hts · Minor variance

    To construct a second storey west side addition.

    220 m away · filed Oct 1, 2021 · Approved

  • 64 Beaverbrook Ave · Minor variance

    To construct a new detached dwelling with an attached garage.

    200 m away · filed Jun 17, 2021 · Approved

  • 20 Ravenscrest Dr · Minor variance

    To construct a new detached dwelling with an attached garage. A previous Committee of Adjustment application (A0295/20EYK) approved a variance related to front yard setback.

    40 m away · filed Apr 27, 2021 · Approved

  • 20 Ravenscrest Dr · Minor variance

    To construct a new detached dwelling with an attached garage.

    40 m away · filed Aug 7, 2020 · Approved

Everything planned in Etobicoke Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.