Toronto address · Ward 8, Eglinton-Lawrence
140 Castlewood Rd
The City of Toronto has 5 building permits since 2017 (5 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Revision issued
Heating and ventilation
Revision #1: HVAC system, ducting and diffuser locations to suite as built. HVAC - Permit to construct new 2nd floor addition with interior alterations to all floors, new deck, & new 2nd floor balcony to existing single family detached dwelling.
Applied Nov 17, 2015 · issued Nov 18, 2015 · Permit 15 126689 HVA (revision 01)
- Inspections under way
Small residential project · Multiple projects
Permit to construct new 2nd floor addition with interior alterations to all floors, new deck, & new 2nd floor balcony to existing single family detached dwelling.
Applied Mar 12, 2015 · issued Mar 26, 2015 · Permit 15 126689 BLD
- Inspections under way
Heating and ventilation
HVAC - Permit to construct new 2nd floor addition with interior alterations to all floors, new deck, & new 2nd floor balcony to existing single family detached dwelling.
Applied Mar 12, 2015 · issued Mar 26, 2015 · Permit 15 126689 HVA
- Inspections under way
Drains and site services
Drain - Permit to construct new 2nd floor addition with interior alterations to all floors, new deck, & new 2nd floor balcony to existing single family detached dwelling.
Applied Mar 12, 2015 · issued Mar 26, 2015 · Permit 15 126689 DRN
- Inspections under way
Plumbing
Plumbing - Permit to construct new 2nd floor addition with interior alterations to all floors, new deck, & new 2nd floor balcony to existing single family detached dwelling.
Applied Mar 12, 2015 · issued Mar 26, 2015 · Permit 15 126689 PLB
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
424 Castlefield Ave · Minor variance
210 m away · filed Sep 16, 2026 · Accepted
136 Heddington Ave · Minor variance
To alter the existing front yard landscaping area.
160 m away · filed Jul 30, 2026 · Hearing scheduled
493 Castlefield Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a partial second storey addition above the garage.
30 m away · filed Dec 17, 2025 · Approved
483 St Clements Ave · Minor variance
To construct a new two-storey detached dwelling with a front porch, rear deck, and basement walkout. NOTE: This application was previously deferred at the Committee of Adjustment hearing on October 6, 2025.
130 m away · filed Aug 25, 2025 · Approved
483 St Clements Ave · Minor variance
To construct a new two-storey detached dwelling with a front porch and a rear deck.
130 m away · filed Jun 30, 2025 · Approved
435 Castlefield Ave · Minor variance
To construct a new two-storey detached dwelling with a front porch, rear deck and rear basement walkout. Also proposed is an in-ground swimming pool in the rear yard. Cross-reference previous Minor Variance Application A0040/24NY.
120 m away · filed Aug 28, 2024 · Approved
536 Roselawn Ave · Minor variance
To construct a two-storey addition to the rear of the existing dwelling in conjunction with other interior and exterior alterations.
70 m away · filed May 3, 2024 · Approved
435 Castlefield Ave · Minor variance
Proposal to construct a new dwelling with integrated garage and walkout basement
120 m away · filed Jan 10, 2024 · Refused
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.