Toronto address · Ward 21, Scarborough Centre
1411 Warden Ave
The City of Toronto has 29 building permits since 2017 (16 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Permit issued
Addition or alteration · Interior alterations
Proposal to expand existing optical centre in existing retail building.
Applied Jan 22, 2026 · issued Feb 23, 2026 · Permit 26 107746 BLD
- Inspections under way
Heating and ventilation
HVAC - Proposal to expand existing optical centre in existing retail building.
Applied Jan 22, 2026 · issued Jul 16, 2026 · Permit 26 107746 HVA
- Closed
Plumbing
Plumbing - Proposal to expand existing optical centre in existing retail building.
Applied Jan 22, 2026 · issued Mar 26, 2026 · completed Sep 2, 2026 · Permit 26 107746 PLB
- Inspections under way
Plumbing
Plumbing - Proposed interior alterations to existing restroom, vestibule hallway and drinking fountain alcove.
Applied Sep 24, 2025 · issued Oct 16, 2025 · Permit 25 230083 PLB
- Inspections under way
Heating and ventilation
HVAC - Proposed interior alterations to existing restroom, vestibule hallway and drinking fountain alcove.
Applied Sep 24, 2025 · issued Oct 16, 2025 · Permit 25 230083 HVA
- Inspections under way
Addition or alteration · Interior alterations
Proposed interior alterations to existing restroom, vestibule hallway and drinking fountain alcove.
Applied Sep 24, 2025 · issued Oct 14, 2025 · Permit 25 230083 BLD
- Cancelled
Heating and ventilation
HVAC - Proposed alterations to existing restroom, vestibule hallway and drinking fountain alcove.
Applied Jul 22, 2025 · completed Aug 13, 2025 · Permit 25 198067 HVA
- Cancelled
Addition or alteration · Interior alterations
Proposed alterations to existing restroom, vestibule hallway and drinking fountain alcove.
Applied Jul 22, 2025 · completed Aug 13, 2025 · Permit 25 198067 BLD
- Cancelled
Plumbing
Plumbing - Proposed alterations to existing restroom, vestibule hallway and drinking fountain alcove.
Applied Jul 22, 2025 · completed Aug 13, 2025 · Permit 25 198067 PLB
- Inspections under way
Addition or alteration · Interior alterations
Proposal to build a new hearing aid center in the entrance canopy
Applied Jun 27, 2025 · issued Jul 18, 2025 · Permit 25 184735 BLD
- Permit issued
Fire and security upgrade · Fire alarm
Proposed replacement of fire alarm control panel and annunciator, no other modifications.
Applied Sep 5, 2023 · issued Sep 7, 2023 · Permit 23 198143 FSU
- Cancelled
Designated structure · Sign building permit related
This property is located in the E-Employment sign district and is subject to the City of Toronto Municipal Code Chapter 694, Signs, General.In conjunction with a single-storey building on the premises, proposal to erect and display an illuminated wall sign, displaying static copy at the first floor on the south east elevation. The sign measuring 7.31 metres horizontally by 1.99 metres vertically at a height of 9 metres above grade.****COSTCO****
Applied Dec 6, 2019 · issued Jan 30, 2020 · completed Oct 18, 2021 · Permit 19 257892 DST
Show 17 more permits
- Closed
New building
Proposed replacement of existing controller enclosure with a new prefabricated controller enclosure as part of the fuel facility expansion for Costco.
Applied Sep 11, 2019 · issued Sep 27, 2019 · completed Nov 21, 2019 · Permit 19 219390 BLD
- Closed
Designated structure · Sign building permit related
In conjunction with a gas canopy on the premises, proposal to erect and display four illuminated overhanging structure signs, all displaying static copy, located on the north, south, east and west elevations. The proposed signs are 0.74 metres vertically by 2.61 metres horizontally at a height of 5.14 metres above grade.****COSTCO****
Applied Apr 26, 2019 · issued May 28, 2019 · completed Nov 6, 2019 · Permit 19 139178 DST
- Closed
Addition or alteration · Multiple projects
Proposed canopy extension to accomodate 3 fueling islands, controller enclosure, warming hut and site servicing for Costco Wholesale.
Applied Mar 14, 2019 · issued Aug 27, 2019 · completed Nov 18, 2019 · Permit 19 125575 BLD
- Closed
Drains and site services · Inside and outside drains
Drain - Proposed canopy extension to accomodate 3 fueling islands, controller enclosure, warming hut and site servicing for Costco Wholesale.
Applied Mar 14, 2019 · issued Aug 28, 2019 · completed Nov 14, 2019 · Permit 19 125575 STS
- Closed
Plumbing · Backflow prevention devices (Water only)
Proposal to install a backflow device in the non res building
Applied Mar 28, 2017 · issued Apr 3, 2017 · completed Oct 13, 2021 · Permit 17 135144 PSA
- Inspections under way
Heating and ventilation
HVAC - interior alterations to add hearing centre adjacent to Pharmacy in Costco store
Applied Apr 9, 2013 · issued Jul 12, 2013 · Permit 13 146697 HVA
- Inspections under way
Plumbing
Plumbing - interior alterations to add hearing centre adjacent to Pharmacy in Costco store
Applied Apr 9, 2013 · issued Jul 12, 2013 · Permit 13 146697 PLB
- Permit issued
Addition or alteration · Interior alterations
interior alterations to add hearing centre adjacent to Pharmacy in Costco store
Applied Apr 9, 2013 · issued Jul 12, 2013 · Permit 13 146697 BLD
- Application on hold
Fire and security upgrade
FS - Sprinkler Shop Drawing - Install new P.O.S. Freezer, expand existing Bakery Cooler and Freezer, Relocate various plumbing fixtures
Applied Jul 14, 2011 · Permit 11 213618 FSU
- Permit issued
Addition or alteration · Interior alterations
Install new P.O.S. Freezer, expand existing Bakery Cooler and Freezer, Relocate various plumbing fixtures
Applied Jun 8, 2011 · issued Jul 15, 2011 · Permit 11 213618 BLD
- Inspections under way
Plumbing
Plumbing - Install new P.O.S. Freezer, expand existing Bakery Cooler and Freezer, Relocate various plumbing fixtures
Applied Jun 8, 2011 · issued Jul 15, 2011 · Permit 11 213618 PLB
- Inspections under way
Drains and site services · Inside and outside drains
Drain - new gas station for COSTCO
Applied Feb 2, 2010 · issued Jul 28, 2010 · Permit 10 105289 STS
- Closed
New building
new gas station for COSTCO
Applied Jan 15, 2010 · issued Jul 28, 2010 · completed Sep 25, 2026 · Permit 10 105289 BLD
- Closed
Heating and ventilation
rev #1- revise layoutHVAC - renovations to food services, dairy cooler and p.o.s cooler and freezers
Applied Jul 22, 2008 · issued Jan 13, 2011 · completed Feb 2, 2026 · Permit 07 265461 HVA (revision 01)
- Revision issued
Addition or alteration · Interior alterations
REV #1-RELOCATE WALL, OPTICAL & MEMBERSHIP SALES DESKrenovations to food services, dairy cooler and p.o.s cooler and freezers
Applied Jul 21, 2008 · issued Jan 13, 2011 · Permit 07 265461 BLD (revision 01)
- Closed
Heating and ventilation
HVAC - renovations to food services, dairy cooler and p.o.s cooler and freezers
Applied Sep 27, 2007 · issued Feb 20, 2008 · completed Feb 2, 2026 · Permit 07 265461 HVA
- Inspections under way
Addition or alteration · Interior alterations
renovations to food services, dairy cooler and p.o.s cooler and freezers
Applied Sep 27, 2007 · issued Feb 20, 2008 · Permit 07 265461 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · Other
To expand the Costco gas bar from the existing 12 fueling positions to 18 fueling positions, and to increase the number of queue lanes from the existing three lanes to six lanes. The proposed expansion would encompass an adjacent 5,905 sq m parcel of land at 9B Canadian Road that Costco would lease from the City of Toronto. The Committee of Adjustment will also consider a related application for variances on the City-owned land (File A0066/19SC).
Decision: Approved (hearing Apr 11, 2019)
Filed Feb 22, 2019 · File A0053/19SC
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
441 Ellesmere Rd · Minor variance
To permit a reduction in the number of parking spaces provided at the Place of Worship. A new one-storey addition (Phase 3) is proposed to be constructed, connecting the existing three-storey building (Phase 1) and two-storey building (Phase 2) on-site together. Cross-reference previous Minor Variance Application A126/15SC.
220 m away · filed Jun 3, 2025 · Approved
263 Ellington Dr · Minor variance
To construct a new two-storey detached dwelling with a secondary suite in the basement, front porch, front second storey balcony, rear ground floor deck and rear second storey balcony. The existing one-storey detached dwelling will be demolished. Also, to permit an undersized parking space. There will be a total of two dwelling units on the lot.
230 m away · filed Jan 27, 2025 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.