Toronto address · Ward 19, Beaches-East York
142 Brookside Dr
The City of Toronto has 4 building permits since 2017 (3 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Drains and site services · Back water valve (Sewer only)
Proposal to install a back water valve
Applied Sep 17, 2018 · issued Sep 17, 2018 · completed Sep 19, 2018 · Permit 18 226509 DRN
- Inspections under way
Heating and ventilation
HVAC - Proposal to construct a 2 storey rear addition, interior alterations and a rear deck to an existing detached single family dwelling.
Applied Jan 23, 2014 · issued Feb 5, 2014 · Permit 14 107213 HVA
- Inspections under way
Plumbing
Plumbing - Proposal to construct a 2 storey rear addition, interior alterations and a rear deck to an existing detached single family dwelling.
Applied Jan 21, 2014 · issued Jan 30, 2014 · Permit 14 107213 PLB
- Inspections under way
Small residential project · Multiple projects
Proposal to construct a 2 storey rear addition, interior alterations and a rear deck to an existing detached single family dwelling. (C of A decision)
Applied Jan 21, 2014 · issued Jan 30, 2014 · Permit 14 107213 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
8 storeys · 57 homes · Residential
480 m away · Rezoning · Under review · filed Apr 23, 2021
- Approved
Neighbours’ Committee of Adjustment files within 250 m
158 Glenmount Park Rd · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear one-storey addition, a rear basement walkout, and a rear ground floor deck. There will be a total of two residential dwelling units (duplex) on this lot. Also, to demolish the one-storey ancillary building (garage/storage area), in the rear yard.
100 m away · filed Sep 5, 2024 · Approved
21 Glen Davis Cres · Minor variance
To construct a new one-storey detached dwelling with an integral garage, a front porch, a rear terrace, and a south side window with a fire shutter.
190 m away · filed May 16, 2024 · Approved
98 Golfview Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a south side one-storey addition with a ground floor covered deck and stairs. The existing ancillary building (shed) in the side yard will be demolished.
220 m away · filed May 7, 2024 · Approved
78 Glenmount Park Rd · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a new front landing with stairs, enclosing the existing front porch and converting it into habitable space.
160 m away · filed Oct 2, 2023 · Approved
19 Devon Rd · Minor variance
To alter the existing one-storey detached dwelling by constructing a three-storey addition, with a front covered porch, a front basement walkout, front second and third storey balconies, a rear ground floor deck, a rear basement walkout, and a rear third storey balcony. This building will have one primary unit and two secondary suites (both suites within the basement).
220 m away · filed Feb 7, 2023 · Approved
191 Glenmount Park Rd · Minor variance
To permit the ancillary building (detached garage) under construction at the rear of the property.
200 m away · filed Jan 11, 2023 · Approved
185 Golfview Ave · Minor variance
To alter the existing three-storey detached dwelling by constructing dorimer additions on the third floor.
180 m away · filed Aug 17, 2022 · Application withdrawn
123 Glenmount Park Rd · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition with a rear ground floor deck.
110 m away · filed Aug 3, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.