Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 9, Davenport

142 Earlscourt Ave

The City of Toronto has 1 building permit since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Carport

    Proposed carport to an existing semi-detached dwelling

    Applied Aug 8, 2022 · issued Nov 28, 2023 · completed Dec 5, 2023 · Permit 22 187520 BLD

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To permit the existing one-and-one-half-storey ancillary structure (carport roof structure with storage space above) in the rear yard. The existing two-storey semi-detached dwelling will be maintained and unaltered.

    Decision: Approved (hearing Nov 8, 2023)

    Filed Jun 1, 2023 · File A0531/23TEY

    Closed

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 133 Boon Ave · Minor variance

    To legalize and to maintain the rear fourth storey addition with a rooftop terrace (on the roof of the third storey), of the existing three-and-one-half-storey semi-detached dwelling (basement level is considered the first storey), that was constructed without an authorized building permit. Also, to permit the rear two-storey addition (located at the rear of the second and third storeys of the dwelling) that was constructed beyond the limits of an authorized building permit (19 212470 BLD 00 SR).

    160 m away · filed Jun 4, 2026 · Approved

  • 188 Nairn Ave · Minor variance

    180 m away · filed May 12, 2026 · Postponed

  • 75 Harvie Ave · Minor variance

    To legalize and to maintain the existing rear one-storey addition (ground floor enclosure), which was constructed without an authorized building permit.

    200 m away · filed Mar 13, 2025 · Approved

  • 136 Ascot Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by enclosing the rear ground terrace into habitable space. The existing one-storey ancillary building (attached garage in the rear yard, abutting Nairn Avenue) will be maintained and unaltered.

    230 m away · filed Dec 2, 2024 · Approved

  • 195 Nairn Ave · Minor variance

    To convert the existing one-storey detached dwelling (one unit) into a three-storey detached dwelling (duplex) by constructing a rear one-storey addition with a ground floor deck, and second and third storey additions. Also, to reconstruct the front porch, the front basement walk-out, and the rear one-storey ancillary building (detached garage, abutting the laneway). There will be a total of two residential dwelling units on this lot.

    170 m away · filed Feb 5, 2024 · Approved

  • 75 Harvie Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear second storey addition that will be cantilevered beyond the existing ground floor level to provide a covered open space below.

    200 m away · filed Nov 13, 2023 · Approved

  • 17 Day Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear one-storey addition and new stairs.

    240 m away · filed Apr 25, 2023 · Withdrawn

  • 205 Earlscourt Ave · Minor variance

    To alter the existing one-storey detached dwelling by constructing a one-storey ground floor side (north) addition for an integral garage and a complete second storey addition.

    240 m away · filed Dec 12, 2022 · Approved

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.