Toronto address · Ward 5, York South-Weston
142 Langden Ave
The City of Toronto has 6 building permits since 2017 (6 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Revision issued
Small residential project · Interior alterations
Revision #01 - Proposed locker rooms in the basement, removal of stairs in the basement, exclude basement level from unit 1, designate the main floor as the sole area for unit 1.Proposal for interior alterations to convert existing 2-storey semi-detached single-familly dwelling to include a new secondary suite on the second floor.
Applied Feb 28, 2024 · issued Mar 8, 2024 · Permit 21 105640 BLD (revision 01)
- Inspections under way
Heating and ventilation
HVAC - Proposal for interior alterations to convert existing 2-storey semi-detached single-familly dwelling to include a new secondary suite on the second floor.
Applied Aug 11, 2022 · issued Aug 15, 2022 · Permit 21 105640 HVA
- Inspections under way
Small residential project · Interior alterations
Proposal for interior alterations to convert existing 2-storey semi-detached single-familly dwelling to include a new secondary suite on the second floor.
Applied Jan 18, 2021 · issued Apr 20, 2022 · 1 home added · Permit 21 105640 BLD
- Inspections under way
Plumbing
Plumbing - Proposal for interior alterations to convert existing 2 storey semi dwelling to 2 units.
Applied Jan 18, 2021 · issued Apr 20, 2022 · Permit 21 105640 PLB
- Inspections under way
Small residential project · Other
Proposal to construct a basement walkout and add a window in the basement of an existing SFD-semi dwelling.
Applied Oct 28, 2020 · issued May 5, 2022 · Permit 20 212342 BLD
- Inspections under way
Plumbing · Fixtures/Roof Drains: SFD
Proposal to convert a closet to a bathroom on the second floor.
Applied Nov 16, 2017 · issued Nov 16, 2017 · Permit 17 263222 PSA
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
112 Langden Ave · Minor variance
To construct a covered front yard porch and to reconstruct an existing pergola in the rear yard.
130 m away · filed Jun 17, 2026 · Approved
76 Greendale Ave · Minor variance
To construct a new fourplex dwelling with second floor front and rear balconies and a front basement walk-out entrance.
120 m away · filed Mar 4, 2025 · Approved
104 Langden Ave · Minor variance
To legalize and to maintain the detached garage in the rear yard.
170 m away · filed Oct 28, 2024 · Approved
39 Greendale Ave · Minor variance
To legalize and to maintain the existing one-storey rear addition.
160 m away · filed Mar 14, 2024 · Approved
20 Guestville Ave · Minor variance
To legalize and to maintain the existing detached garage.
160 m away · filed Aug 23, 2023 · Approved
43 Greendale Ave · Minor variance
To construct a new detached dwelling with two second storey rear platforms and a new detached garage in the rear yard.
140 m away · filed May 3, 2022 · Approved
11 Caesar Ave · Minor variance
To convert a portion of the basement into an additional dwelling unit, construct a two-storey rear addition, a covered front porch, a rear yard covered deck and a rear yard detached garage.
200 m away · filed Mar 26, 2021 · Approved
84 Greendale Ave · Minor variance
To construct a one-storey rear addition, a new rear deck and new second storey rear platform.
130 m away · filed Jan 20, 2021 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.