Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 14, Toronto-Danforth

143 Memorial Park Ave

The City of Toronto has 1 building permit since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Drains and site services · Back water valve (Sewer only)

    Proposal to install a backwater valve on the sanitary line in an existing SFD-detached dwelling.

    Applied Jun 29, 2020 · issued Jul 2, 2020 · completed Jul 28, 2020 · Permit 20 161290 DRN

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 208 Linsmore Cres · Minor variance

    To legalize and maintain the building height of the existing two-storey detached dwelling (as approved by Minor Variance Decision A0187/22TEY), which was constructed beyond the limits of the authorized building permit No. 22 219682 BLD 00 NH.

    170 m away · filed May 6, 2026 · Approved

  • 353 Monarch Park Ave · Minor variance

    To alter the existing two-storey detached dwelling by converting the integral garage into habitable space. Also, to permit a front yard parking space.

    60 m away · filed Feb 13, 2026 · Approved

  • 356 Monarch Park Ave · Minor variance

    To alter the existing one-and-one-half-storey detached dwelling by constructing a complete second storey addition- (which will be cantilevered on the south side) with front and rear balconies, a rear one-storey addition, a front one-storey addition with a covered porch, a rear ground floor deck, and a rear basement walkout. Also, to construct a new one-storey detached ancillary building (to contain a garage), in the rear yard. There will be a total of two residential dwelling units on this lot (one unit within the basement level and one unit occupying the first and second levels).

    70 m away · filed Aug 14, 2025 · Approved

  • 80 Durant Ave · Minor variance

    To construct a new two-storey detached dwelling (duplex) with an integral garage, a covered front porch with stairs, and a covered rear deck with stairs. Also, to construct a one-storey ancillary building (to contain one garden suite) in the rear yard. There will be a total of three residential dwelling units on this lot (two units within the main dwelling and one unit within the ancillary building).

    160 m away · filed Nov 22, 2024 · Approved

  • 10 McKayfield Rd · Minor variance

    To alter the existing one-storey detached dwelling by constructing a complete second storey addition, a rear two-storey addition, a rear ground floor deck, front and side (south) porches, a new shed in the rear yard, and an undersized parking space on the south side of the dwelling. The existing rear detached garage will be demolished.

    80 m away · filed Nov 16, 2023 · Approved

  • 76 Roosevelt Rd · Minor variance

    To construct a new two-storey detached dwelling with an integral garage, a front porch, a rear covered loggia, and a rear basement walkout. Also, to install an in-ground swimming pool in the rear yard.

    70 m away · filed Nov 3, 2022 · Approved

  • 208 Linsmore Cres · Minor variance

    To construct a new two-storey detached dwelling with an integral garage, a front porch and a rear loggia.

    170 m away · filed Feb 4, 2022 · Approved

  • 12 Lankin Blvd · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a third storey addition.

    250 m away · filed Jan 18, 2022 · Approved

Everything planned in Toronto-Danforth

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.