Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 13, Toronto Centre

145 Front St E

The City of Toronto has 7 building permits since 2017 (6 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    Hvac - interior alterations to fit up a new hair beauty salon in vacant unit g2 on the ground floor of the building

    Applied Jun 23, 2026 · issued Aug 12, 2026 · Permit 26 189704 HVA

    Permit issued
  • Plumbing

    Plumbing - INTERIOR ALTERATIONS TO FIT UP A NEW HAIR BEAUTY SALON IN VACANT UNIT G2 ON THE GROUND FLOOR OF THE BUILDING

    Applied Jun 23, 2026 · issued Aug 12, 2026 · Permit 26 189704 PLB

    Inspections under way
  • Addition or alteration · Interior alterations

    Interior alterations to fit up a new hair beauty salon in vacant unit g2 on the ground floor of the building

    Applied Jun 23, 2026 · issued Aug 12, 2026 · Permit 26 189704 BLD

    Inspections under way
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to existing office suite 301 / 302 for tenant - 'Loft Community Services'. Work includes new receiption partition & millwork desk, new lighting throughout, HVAC rebalancing.

    Applied Nov 30, 2023 · issued Jan 9, 2024 · Permit 23 231465 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - Interior alterations to unit 301/302 - new receiption partition and millwork desk, new lighting throughout, HVAC rebalancing.

    Applied Nov 30, 2023 · issued Jan 9, 2024 · completed May 27, 2025 · Permit 23 231465 HVA

    Closed
  • Fire and security upgrade · Fire alarm

    Replace exsitng obsolete fire alarm control panel, no new zones or devices.

    Applied Jan 20, 2017 · issued Feb 15, 2017 · Permit 17 106837 FSU

    Inspections under way
  • Heating and ventilation

    HVAC - Interior alterations to existing office space - floor 3 - suite 306 - Prostate Cancer Research Foundation.

    Applied Jan 23, 2008 · issued Feb 5, 2008 · Permit 08 105586 HVA

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 120 Front St E · Minor variance

    To alter the existing mixed-use building by designating 37 of the 43 non-residential parking spaces (located on the B-1 level) as a "Public Parking" use with the intent of permitting 20 of the 37 parking spaces to be leased as valet parking to a proposed hotel (municipally known as 197 King Street East) and the remaining 17 parking spaces to be rented to members of the public on a monthly basis.

    60 m away · filed Sep 15, 2022 · Approved

  • 110 George St S · Minor variance

    To alter the existing 11-storey apartment building, from the original building permit, by removing four vehicle parking spaces in order to construct a new storage and bicycle room on Parking Level 1.

    120 m away · filed Aug 23, 2021 · Approved

  • 140 The Esplanade · Minor variance

    To alter parking level one of the existing mixed-use building by converting four parking spaces into two accessible parking spaces.

    180 m away · filed Jul 8, 2021 · Approved

  • 197 King St E · Minor variance

    To alter the existing 4-storey mixed-use building by constructing additions above and to the rear resulting in an 8-storey mixed use building containing a commercial restaurant use at the ground floor and basement with hotel suites above.

    100 m away · filed Oct 30, 2019 · Approved

  • 159 Frederick St · Minor variance

    To alter the 11-storey mixed-use building by converting a portion of the basement into office space.

    90 m away · filed Jun 12, 2019 · Approved

  • 120 Front St E · Minor variance

    To convert 41 existing underground parking spaces (currently designated for office use) to a commercial parking garage. There will be 90 parking spaces in total: 45 residential, 4 office, and 41 in the new commercial parking garage. No change to the built form is proposed.

    60 m away · filed Sep 15, 2017 · Withdrawn

Everything planned in Toronto Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.