Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 12, Toronto-St. Paul's

145 Hillsdale Ave W

The City of Toronto has 4 building permits since 2017 (3 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - Proposed basement underpining, two storey rear addition, interior alterations throughout, basement underpinning, covered front porch and rear deck.- Underpinning: 22.6 m- 1st floor addition: 44.91 sq.m- 2nd floor addition: 38.58 sq.m- basement area of work (new and existing): 44.17 sq.m + 57.04 sq.m = 101.21 sq.m- 1st floor interior alterations: 64.21 sq.m- 2nd floor interior alterations: 57.66 sq.m

    Applied Jul 14, 2022 · issued Jul 18, 2022 · Permit 22 156174 HVA

    Inspections under way
  • Plumbing

    Plumbing - Proposed basement underpining, two storey rear addition, interior alterations throughout, basement underpinning, covered front porch and rear deck.- Underpinning: 22.6 m- 1st floor addition: 44.91 sq.m- 2nd floor addition: 38.58 sq.m- basement area of work (new and existing): 44.17 sq.m + 57.04 sq.m = 101.21 sq.m- 1st floor interior alterations: 64.21 sq.m- 2nd floor interior alterations: 57.66 sq.m

    Applied Jun 6, 2022 · issued Jun 28, 2022 · Permit 22 156174 PLB

    Inspections under way
  • Drains and site services

    Drain - Proposed basement underpining, two storey rear addition, interior alterations throughout, basement underpinning, covered front porch and rear deck.- Underpinning: 22.6 m- 1st floor addition: 44.91 sq.m- 2nd floor addition: 38.58 sq.m- basement area of work (new and existing): 44.17 sq.m + 57.04 sq.m = 101.21 sq.m- 1st floor interior alterations: 64.21 sq.m- 2nd floor interior alterations: 57.66 sq.m

    Applied Jun 6, 2022 · issued Jun 28, 2022 · completed Jun 16, 2025 · Permit 22 156174 DRN

    Closed
  • Small residential project · Multiple projects

    Proposed basement underpining, two storey rear addition, interior alterations throughout, basement underpinning, covered front porch and rear deck.- Underpinning: 22.6 m- 1st floor addition: 44.91 sq.m- 2nd floor addition: 38.58 sq.m- basement area of work (new and existing): 44.17 sq.m + 57.04 sq.m = 101.21 sq.m- 1st floor interior alterations: 64.21 sq.m- 2nd floor interior alterations: 57.66 sq.m

    Applied Jun 2, 2022 · issued Jun 28, 2022 · Permit 22 156174 BLD

    Inspections under way

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To alter the existing two-storey detached dwelling by constructing a rear two-storey addition, a front covered porch and a bay window, and a rear ground floor deck.

    Decision: Approved (hearing Mar 30, 2022)

    Filed Dec 31, 2021 · File A0010/22TEY

    Closed

What’s planned nearby

Development sites within 500 m

  • 29-45 Berwick Avenue

    49 storeys · 552 homes · Residential

    450 m away · Site plan · Under review · filed Jul 10, 2025

    Under review
  • 2128 Yonge Street

    80 homes · Residential

    500 m away · Condominium · Under review · filed Oct 28, 2021

    Under review

Neighbours’ Committee of Adjustment files within 250 m

  • 59 Eastbourne Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a front covered porch with stairs, a front ground floor bay window, a rear two-storey addition (including a basement addition), with two decks and stairs. Also, there will be one side (north) yard parking space. The existing rear one-storey addition, rear deck, and rear one-storey ancillary building (garage) will be demolished.

    120 m away · filed May 25, 2026 · Approved

  • 71 Lascelles Blvd · Minor variance

    To construct a new three-storey detached dwelling with a rear third storey balcony Also, to construct a front widened driveway and a new one-storey ancillary building (cabana) in the rear yard.

    210 m away · filed Apr 13, 2026 · Approved

  • 52 Anderson Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear two-storey addition (including a basement extension) with a rear ground level deck with stairs.

    230 m away · filed Dec 17, 2025 · Approved

  • 102 Highbourne Rd · Minor variance

    To construct a new three-storey detached dwelling with a front covered ground floor porch, a rear covered ground floor deck, and a front yard parking pad.

    210 m away · filed Apr 5, 2023 · Approved

  • 76 Eastbourne Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a one-storey side (south) addition on the ground level and a partial rear two-storey addition.

    40 m away · filed Mar 15, 2023 · Approved

  • 122 Highbourne Rd · Minor variance

    To construct a new two-storey detached dwelling with an integral garage, an oversized driveway, and an access ramp along the north side of the dwelling.

    180 m away · filed Jan 27, 2023 · Approved

  • 470 Oriole Pkwy · Consent

    To obtain consent to sever the property into two undersized residential lots and to create an easement/right-of-way.

    220 m away · filed Feb 23, 2022 · Approved

  • 470 Oriole Pkwy · Minor variance

    To convert the existing two-storey, five-unit detached dwelling into a two-storey, three-unit semi-detached dwelling by constructing a partition wall in the basement and removing the existing front door.

    220 m away · filed Feb 23, 2022 · Approved

Everything planned in Toronto-St. Paul's

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.